Inspect how cited figures bind into build-time claims audits so no statutory briefing carries an unverified statistic.
Read verification methods →Proof · Public-record provenance wall
Every public figure has an origin.
Tie Wang publishes zero unsourced statistics. Every external numeral on this site resolves to a dated institutional record, an international standard or a peer-reviewed dataset with a direct HTTPS link.
Showing all 144 sources (289 canonical records) · dot area scales with citation count
01 · Evidence discipline
How public records enter and hold their seat in the Tie Wang register
Every external statistic on the site must pass four mechanical checks before a build succeeds: unique canonical identifier, named institutional publisher, live HTTPS URL and zero client-identifying leakage.
Deduplicated public-record facts across the site bibliography, identical to the downloadable CSV and JSON datasets.
Unique institutional publications, standards and peer-reviewed papers referenced across the site.
Entries taken directly from international standards bodies, multilateral statistical tables or statutory agencies.
Working papers or syntheses quoting an underlying dataset, flagged explicitly for reader verification.
Why provenance is an engineering control, not a footnote
In infrastructure finance and sovereign revenue reform, a single misquoted benchmark can distort a tariff model, a sensitivity range or a parliamentary brief. Under Tie Wang's second heat, the auditor's heat, no author may paste an unattributed percentage into narrative prose. Every external number is stored in the canonical register, rendered with an interactive inline citation popover, and audited on every build by automated verification gates.
For example, when Tie Wang discusses third-party reporting versus self-declaration, the page cites the randomised audit finding of Sourced tax-2 · 2011 Evasion rate on self-reported income in the same experiment Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011 Open public record ↗ evasion on self-reported income against Sourced tax-1 · 2011 Evasion rate on income reported by third parties (employers, banks) in a randomised tax-audit experiment Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011 Open public record ↗ on third-party reported income, or when discussing liquid custody transfer, it cites the Sourced met-1 · 2019 Maximum permissible error of an accuracy class 0.3 dynamic liquid measuring system (custody transfer of crude oil and products) OIML R 117-1:2019, Dynamic measuring systems for liquids other than water Open public record ↗ system maximum permissible error under OIML R 117-1. Clicking any inline figure opens its publisher, title, year and direct public-record URL without leaving the reading position.
Source grading and client-blind filtering
Every entry in the canonical register carries an explicit evidence grade. Grade A records come directly from primary institutional issuers: ISO, IEC, OIML, NIST, IETF, IMO, ICAO, WCO, World Bank, UNCTAD, IEA, ITU, ILO, WHO, EIA and peer-reviewed journals. Grade B records are institutional syntheses or working papers that cite an underlying primary dataset; their source string states both the publishing body and the cited authority so a diligence team can walk back to the original release.
All records also pass the client-blind filter before shipping. Public statistics may reference global aggregates, regional blocks or non-restricted third-party studies, but no figure ever discloses a host authority, a private counterparty, a contract fee or an engagement location. Where an example requires illustrative numbers, those figures are never placed in the sourced register and instead carry a visible Illustrative chip.
02 · Composition of the evidence base
Publication recency and institutional diversity across the fact register
Toggle between publication-year strata and publisher-kind shares to inspect how the evidence base balances recent empirical data against enduring technical standards.
The register holds 289 canonical entries across 144 distinct sources: Intergovernmental & multilateral 155, Standards body 42, Government & regulator 32, Industry & trade 41, Peer-reviewed academic 19.
Source: Computed at build time from the canonical Tie Wang fact register (identical to /data/facts.json; cutoff 2026-11)
| Publication band | Distinct sources | Canonical entries |
|---|---|---|
| Pre-2015 | 23 | 43 |
| 2015 to 2018 | 9 | 13 |
| 2019 to 2021 | 17 | 29 |
| 2022 to 2023 | 27 | 54 |
| 2024 | 25 | 49 |
| 2025 to 2026 | 43 | 101 |
Source: Derived from the canonical Tie Wang fact register at build time
03 · Complete searchable register
Filter every cited fact by publisher kind, evidence grade, year or text
The initial slice renders statically for instant load; filtering, searching or loading more fetches the full canonical register from /data/facts.json.
- fin-1 · Intergovernmental & multilateral · 2021 Grade A
76%
Adults worldwide with an account at a financial institution or a mobile money provider in 2021
World Bank, Global Findex Database 2021
- fin-2 · Intergovernmental & multilateral · 2021 Grade A
33%
Adults in Sub-Saharan Africa with a mobile money account in 2021
World Bank, Global Findex Database 2021
- gold-1 · Industry & trade · 2024 Grade A
about 20%
Share of global mined gold supply that comes from artisanal and small-scale mining
World Gold Council, Artisanal and small-scale gold mining
- id-1 · Intergovernmental & multilateral · 2021 Grade A
850 million
People worldwide estimated to lack an official proof of identity
World Bank, Identification for Development (ID4D) Global Dataset 2021
- iff-1 · Intergovernmental & multilateral · 2020 Grade A
USD 88.6bn
Estimated illicit capital flight from Africa per year, about 3.7 percent of the continent's GDP
UNCTAD, Economic Development in Africa Report 2020
- iff-2 · Intergovernmental & multilateral · 2020 Grade A
USD 40bn
Estimated export under-invoicing of extractive commodities from Africa in 2015
UNCTAD, Economic Development in Africa Report 2020
- iff-3 · Intergovernmental & multilateral · 2020 Grade A
77%
Share of gold in that estimated extractive export under-invoicing
UNCTAD, Economic Development in Africa Report 2020
- infra-1 · Intergovernmental & multilateral · 2018 Grade A
USD 130bn to 170bn
Estimated annual infrastructure investment needs of Africa
African Development Bank, African Economic Outlook 2018
- infra-2 · Intergovernmental & multilateral · 2018 Grade A
USD 68bn to 108bn
Estimated annual infrastructure financing gap of Africa
African Development Bank, African Economic Outlook 2018
- met-1 · Standards body · 2019 Grade A
0.3%
Maximum permissible error of an accuracy class 0.3 dynamic liquid measuring system (custody transfer of crude oil and products)
OIML R 117-1:2019, Dynamic measuring systems for liquids other than water
- met-2 · Standards body · 2019 Grade A
0.2%
Maximum permissible error of the meter alone in the same accuracy class
OIML R 117-1:2019, Dynamic measuring systems for liquids other than water
- met-3 · Standards body · 1999 Grade A
15 °C and 101.325 kPa
Standard reference conditions for petroleum and liquid petroleum products
ISO 5024:1999, Petroleum liquids and liquefied petroleum gases, measurement, standard reference conditions
- mm-1 · Industry & trade · 2024 Grade A
1.75 billion
Registered mobile money accounts worldwide in 2023
GSMA, State of the Industry Report on Mobile Money 2024
- mm-2 · Industry & trade · 2024 Grade A
USD 1.4 trillion
Value of mobile money transactions processed worldwide in 2023
GSMA, State of the Industry Report on Mobile Money 2024
- mm-3 · Peer-reviewed academic · 2016 Grade A
194,000
Kenyan households (about 2 percent) lifted out of extreme poverty by access to mobile money
Suri and Jack, Science 354(6317), 2016
- pow-1 · Intergovernmental & multilateral · 2022 Grade A
600 million
People in Africa without access to electricity, about 43 percent of the population
International Energy Agency, Africa Energy Outlook 2022
- sea-1 · Intergovernmental & multilateral · 2024 Grade A
over 80%
Share of world merchandise trade by volume carried by sea
UNCTAD, Review of Maritime Transport
- sea-2 · Intergovernmental & multilateral · 2002 Grade A
300 GT
Gross tonnage from which ships on international voyages must carry an automatic identification system (AIS)
International Maritime Organization, SOLAS Chapter V, Regulation 19
- sea-3 · Intergovernmental & multilateral · 2024 Grade A
1 January 2024
Date from which electronic data exchange through a maritime single window became mandatory for ports under the FAL Convention
International Maritime Organization, Convention on Facilitation of International Maritime Traffic
- std-11426 · Standards body · 2021 Grade A
ISO 11426:2021
Jewellery and precious metals: determination of gold by cupellation (fire assay)
ISO 11426:2021
04 · What is not yet known
Scope limits, publication lag and revision protocol
An honest provenance register states what its numbers cannot prove alongside what they establish.
Publication lag and link permanence
Multilateral datasets frequently report two to three years behind the current calendar because national statistical offices reconcile trade, health and fiscal accounts retrospectively. Each record preserves both its publication date and the reference year of the underlying observation so readers never conflate a 2026 report date with a 2022 measurement period.
How corrections enter the register
When an issuer publishes a revised edition or withdraws a series, Tie Wang updates the underlying canonical entry, records the new cutoff date and re-runs the automated fact check and claims audit across every built page. Because every figure renders from one verified key, no orphaned stale number can survive in prose.
05 · Continue the audit
Where each audience goes next from the provenance wall
Download the complete deduplicated fact base as clean CSV or JSON files with original HTTPS URLs for independent credit verification.
Open data downloads →Review every metrological and interface standard designed against across custody transfer and copy-only telemetry.
Inspect standards rack →Cross-check technical vocabulary and plain answers built directly on this shared evidence register.
Open the FAQ desk →