Public-record fact base
Every deduplicated public-record statistic, metrological tolerance and normative reference cited across the Tie Wang site, with publisher, year, grade and HTTPS URL.
Proof · Machine-readable datasets
Build-time generatedEvery figure, controlled term and referenced international standard on this site is compiled at build time into clean RFC-4180 CSV and structured JSON files so auditors, analysts and engineers can inspect them offline.
01 · Direct static downloads
Each link downloads a static file emitted during the same Astro build that renders the website, guaranteeing zero drift between the pages you read and the tables you analyse.
Complete deduplicated public-record fact base matching /sources/.
Terms mapped across Study, Structure, Build, Operate and Transfer.
Canonical international standards designed against, matching /firm/standards/.
Combined UTF-8 payload across all six CSV and JSON endpoints.
Every deduplicated public-record statistic, metrological tolerance and normative reference cited across the Tie Wang site, with publisher, year, grade and HTTPS URL.
Controlled technical, legal, financial and operational terminology mapped across all five programme stages (Study, Structure, Build, Operate, Transfer).
Normative engineering, metrology, security, privacy, financial messaging and governance standards designed against across Study, System and Service.
02 · Live schema & row inspector
Switch tabs below to inspect the exact column headers and sample records emitted into each build-time file.
| ID | Kind | Year | Value | Publisher |
|---|---|---|---|---|
| fin-1 | multilateral | 2021 | 76% | World Bank |
| fin-2 | multilateral | 2021 | 33% | World Bank |
| gold-1 | industry | 2024 | about 20% | World Gold Council |
| id-1 | multilateral | 2021 | 850 million | World Bank |
| iff-1 | multilateral | 2020 | USD 88.6bn | UNCTAD |
| iff-2 | multilateral | 2020 | USD 40bn | UNCTAD |
| iff-3 | multilateral | 2020 | 77% | UNCTAD |
| infra-1 | multilateral | 2018 | USD 130bn to 170bn | African Development Bank |
| ID | Term | Stage | Layer | Definition |
|---|---|---|---|---|
| auditors-heat | Auditor's heat | study | study | The second of Tie Wang's three heats: proving that every published figure traces directly to a model key, a dated public source or a sealed raw event. |
| bankability | Bankability | study | study | The property of a programme whose cashflows, risk allocation, legal enforceability and downside margins satisfy senior lenders and development finance institutions. |
| baseline-audit | Baseline audit | study | study | Pre-programme measurement of existing flows, meters, registries and declaration pathways before any design or capital commitment is locked. |
| breakeven-envelope | Breakeven envelope | study | study | The set of price, volume, cost and delay boundaries beyond which a programme's debt service or operating balance turns negative. |
| client-blind | Client-blind publication | study | study | Public technical writing that sets out architecture, methods and illustrative structures without identifying any authority, counterparty or mandate. |
| competent-person | Competent person | study | study | Qualified technical specialist accountable for signing mineral resource, reserve or engineering estimates under international reporting codes. |
| corridor-study | Corridor study | study | study | Integrated technical and economic assessment of a multi-modal transport spine linking mines, depots, rail lines, dry ports and marine terminals. |
| counterfactual-comparator | Counterfactual comparator | study | study | Reference case estimating public cost, delay and fiscal collection under conventional procurement against which a structured concession is measured. |
| Number | Publisher | Year | Layer | Status |
|---|---|---|---|---|
| ISO 31000:2018 | International Organization for Standardization (ISO) | 2018 | study | designed against |
| IFC Performance Standards (2012) | International Finance Corporation (World Bank Group) | 2012 | study | designed against |
| Equator Principles IV (2020) | Equator Principles Association | 2020 | study | designed against |
| JORC Code (2012) | Joint Ore Reserves Committee (JORC) | 2012 | study | designed against |
| NI 43-101 | Canadian Securities Administrators | 2011 | study | designed against |
| ISO 14064-1:2018 | International Organization for Standardization (ISO) | 2018 | study | designed against |
| EITI Standard 2023 | Extractive Industries Transparency Initiative (EITI) | 2023 | study | designed against |
| OECD Due Diligence Guidance (3rd ed.) | Organisation for Economic Co-operation and Development (OECD) | 2016 | study | designed against |
Tabbable preview showing the first 8 records of the fact base, glossary and standards datasets with exact schema fields.
Source: Tie Wang canonical build-time dataset generator (identical source backing /data/*.csv and /data/*.json)
| Dataset | Rows | Fields | CSV size | JSON size |
|---|---|---|---|---|
| Public-record fact base | 289 | 11 | 123.6 KB | 276.5 KB |
| Programme vocabulary & glossary | 160 | 5 | 30.9 KB | 47.9 KB |
| International standards register | 38 | 9 | 11.5 KB | 18.1 KB |
Source: Measured in Tie Wang canonical dataset generator during static site generation
03 · Data governance & limitations
Every CSV file uses strict RFC-4180 quoting in UTF-8; every JSON file includes a cutoff date and schema count.
Static downloads frequently drift out of date when teams export spreadsheets manually and forget to refresh them after a text edit. Tie Wang generates all six files programmatically from the exact same JSON data modules that render the Sources, Glossary and Standards pages. Automated test assertions verify row counts, CSV quote escaping, HTTPS URL formatting and JSON syntax on every build.
Underlying empirical statistics in facts.json and facts.csv remain the intellectual
property of their original issuing institutions (ISO, OIML, World Bank, UNCTAD, IEA, ITU and others); always
verify against the original publisher URL before citing in a formal financing or statutory document. The
standards list records standards Tie Wang designs against and asserts no third-party certification.
04 · Continue the inspection
Cross-check every downloaded fact row against its visual placement on the provenance wall.
Open Sources wall →Read how every dataset is validated by automated unit tests and verification gates at build time.
Read verification methods →Inspect all international standards designed against across edge, ledger and operations layers.
Open Standards rack →Download approved SVG identity marks and technical schematics with explicit reuse rules.
Open Press kit →