Composed HTML end state
Every block renders its complete, readable final state in static HTML. Motion is layered progressively only when allowed by the visitor and fails safe after a bounded timeout if scripts do not execute.
Utility · Conformance & testing
Designed to meet WCAG 2.2 Level AA across both Paper and Iron colour themes, with deterministic motion controls, keyboard navigation and tabular alternatives for visual exhibits.
Conformance basis
Accessibility is enforced in the shared layout, token system and build gates rather than retrofitted per page.
Every block renders its complete, readable final state in static HTML. Motion is layered progressively only when allowed by the visitor and fails safe after a bounded timeout if scripts do not execute.
The site honours the operating-system reduced-motion preference automatically and provides a one-click Calm button in the header that stops every entrance, ambient loop, WebGL shader and scroll timeline immediately.
SVG exhibits carry text summaries and tabular data alternatives. Every status chip pairs colour with a distinct geometric shape and a plain label so provenance never depends on hue alone.
Verification record
| Audit area | Verification method | Verified state |
|---|---|---|
| WCAG 2.2 AA automated rules | axe-core scan in both composed reduced-motion state and active motion state | Zero serious or critical violations across tested desktop and phone viewports |
| Reduced motion & Calm switch | OS prefers-reduced-motion media query and persistent header Calm toggle | All entrances, live loops and scroll-driven timelines halt; composed end state renders immediately |
| Continuous motion control | Benchmark strip and interactive timeline scrubbers | Visible 44 px Pause/Play control; marquee also pauses on hover and keyboard focus |
| Colour independence & contrast | Semantic Paper and Iron tokens plus colour + shape + text status chips | Minimum 4.5:1 text contrast on both themes; no claim status relies on colour alone |
| Keyboard navigation & focus trap | Skip link, 44 px targets, mega-menu modal focus trap, Escape dismissal and zero-JS sitemap fallback | All interactive controls reachable by keyboard with visible 2 px focus outlines |
| Frame stability & text clipping | Per-frame scroll stability scans in WebKit, Chrome and Firefox plus WebKit clipping scan | Native sticky pinning without counter-translation; zero horizontal overflow across tested widths |
Source: Tie Wang build verification and browser scan suite
Honest boundaries
Procedural WebGL steel plate: On devices without WebGL2, on low-power hardware, or when reduced motion or Calm mode is active, the Home first screen renders a composed static canvas plate alongside the full keyboard-accessible temperature range control and live text readout.
Complex technical diagrams: Multi-node engineering schematics provide structured screen-reader descriptions and companion data tables where quantitative comparisons appear. Where a diagram conveys spatial topology, the accompanying prose restates the same sequence in plain language.
No-JavaScript operation: Navigation, the 22-page menu directory via the sitemap, radio-based chart/table toggles and all page prose remain fully readable without JavaScript. Interactive models and local full-text search require JavaScript.