Skip to main content
Tie Wang Tie Wang Tie Wang Tie Wang
Search
Tie Wang · 22 Menu Pages
Sitemap
04 · Standards

Which international technical, security and metrology standards shape the work?

Firm · Standards

Rules that shape the work, never badges claimed in advance.

Tie Wang designs every study, platform and operation against 38 international technical, metrological, security and audit specifications. Every block on this rack is explicitly marked designed against: Tie Wang claims no corporate certification.

Gauge-block rack · 38 specifications Designed against
STUDY (10) SYSTEM (18) SERVICE (10) ISO 31000:2018 (study): Designed against IFC Performance Standards (2012) (study): Designed against Equator Principles IV (2020) (study): Designed against JORC Code (2012) (study): Designed against NI 43-101 (study): Designed against ISO 14064-1:2018 (study): Designed against EITI Standard 2023 (study): Designed against OECD Due Diligence Guidance (3rd ed.) (study): Designed against ISO 19650-1:2018 (study): Designed against JCGM 100:2008 (GUM) (study): Designed against ISO/IEC 27001:2022 (system): Designed against IEC 62443 (series) (system): Designed against ISO/IEC 42001:2023 (system): Designed against OIML R 117-1:2019 (system): Designed against API MPMS (system): Designed against ISO 5167-1:2022 (system): Designed against ICAO Doc 9303 (8th ed.) (system): Designed against ICAO Annex 9 (16th ed.) (system): Designed against UN/EDIFACT PAXLST (system): Designed against ISO/IEC 30107-1:2023 (system): Designed against WCO Data Model v4.1 (system): Designed against ISO 20022 (system): Designed against NIST FIPS 180-4 (system): Designed against IETF RFC 9162 (system): Designed against IETF RFC 3161 (system): Designed against W3C WCAG 2.2 (system): Designed against ITU-T E.164 (system): Designed against NIST SP 800-53 Rev. 5 (system): Designed against ISO 9001:2015 (service): Designed against ISO/IEC 20000-1:2018 (service): Designed against ISO 22301:2019 (service): Designed against ISO 55001:2014 (service): Designed against ISO/IEC 17025:2017 (service): Designed against ISO 14001:2015 (service): Designed against ISO 45001:2018 (service): Designed against ISO 37001:2025 (service): Designed against ISO 19011:2018 (service): Designed against EU Regulation 2016/679 (GDPR) (service): Designed against CLICK ANY GAUGE BLOCK OR FILTER BY LAYER · EVERY STANDARD MARKED DESIGNED AGAINST (NEVER CERTIFIED)
ISO 31000:2018 · STUDY LAYER · DESIGNED AGAINST Principles, framework, and process for identifying, quantifying, and treating programme and enterprise risk. International Organization for Standardization (ISO) (2018) · Risk management: Guidelines
Why designed against is stricter than a badge
38 specifications · Study 10 · System 18 · Service 10

01 · Precision & truth

Designed against international specifications; never falsely certified

A technical partner should state exactly which engineering rules govern its architectures and which independent accredited body must audit the delivered programme in country.

Specifications in register Sourced
38

International standards mapped across Study (10), System (18) and Service (10) from the Tie Wang research register.

Liquid custody class 0.3 Sourced
Sourced met-1 · 2019 Maximum permissible error of an accuracy class 0.3 dynamic liquid measuring system (custody transfer of crude oil and products) OIML R 117-1:2019, Dynamic measuring systems for liquids other than water Open public record ↗

Maximum permissible error under OIML R 117-1 for accuracy class 0.3 complete liquid measuring systems (0.2% meter alone).

Uncertainty coverage factor Sourced
Sourced ref-met-2 · 2008 Typical coverage factor range multiplying combined standard uncertainty to express expanded measurement uncertainty under JCGM 100:2008 Bureau International des Poids et Mesures (BIPM / JCGM), JCGM 100:2008 (GUM) Open public record ↗

Standard JCGM 100:2008 (GUM) multiplier converting combined standard uncertainty into expanded uncertainty.

Web accessibility contrast Sourced
Sourced a11y-1 · 2023 Minimum luminance contrast ratio required for normal text under W3C WCAG 2.2 Level AA Success Criterion 1.4.3 World Wide Web Consortium (W3C), WCAG 2.2 (2023) Open public record ↗

Minimum normal-text luminance contrast under W3C WCAG 2.2 Level AA applied across public and officer portals.

Why badges on a brochure mislead public authorities

Corporate certificates are issued to a specific legal entity, scope and site at a specific date. When an advisory or engineering website prints generic ISO logos next to a greenfield national concession, it obscures a critical operational truth: a new in-country project company, sovereign data centre or calibration laboratory must earn its own accredited verification after commissioning.

Tie Wang therefore states its position plainly. Every specification in our register is marked designed against. Our feasibility methodologies, interface schemas, hardware security zones, uncertainty budgets and service-level runbooks are built directly from the published clauses of those 38 standards so that an accredited third-party auditor or national metrology institute can inspect and certify the operational SPV cleanly after go-live.

Interoperability prevents single-vendor captivity

Designing against open international specifications also protects sovereign flexibility over fifteen to twenty-five year terms. Using Sourced std-oas · 2021 OpenAPI Specification for describing HTTP interfaces OpenAPI Specification 3.1.0 Open public record ↗ HTTP schemas, Sourced std-20022 · 2023 Universal financial industry message scheme ISO 20022 Open public record ↗ financial messages, Sourced std-sha256 · 2015 Secure Hash Standard: specifies the SHA-256 algorithm used to compute the digest of each record National Institute of Standards and Technology, FIPS PUB 180-4, 2015 Open public record ↗ cryptographic digests and WCO Data Model customs records means any competent local or international engineering team can audit, extend or replace a module without paying a proprietary translation toll.

Where software defects consume roughly Sourced sw-5 · 2002 Approximate share of total software development costs consumed by identifying and correcting defects National Institute of Standards and Technology (NIST), Economic Impacts of Inadequate Infrastructure for Software Testing (2002) Open public record ↗ of typical development expenditure, building conformance checks directly into continuous integration and metrological proving reduces late-stage rework and gives lenders objective acceptance gates at Day 90 and beyond.

02 · Standards mapped to The Section

How international specifications bind Study, System and Service

Each layer of a Tie Wang programme draws on a distinct family of published technical rules.

Layer 01 · Study (10 standards) STUDY SPECIFICATIONS · BANKABLE EVIDENCE · ISO 31000:2018 & JCGM 100:2008 (risk & uncertainty) · IFC Performance Standards & Equator Principles IV · JORC Code (2012) & NI 43-101 mineral reporting · EITI Standard 2023, OECD DDG, ISO 14064-1, ISO 19650-1 ALL 10 SPECIFICATIONS DESIGNED AGAINST IN FEASIBILITY & STRUCTURING
Layer 02 · System (18 standards) SYSTEM SPECIFICATIONS · METROLOGY, SECURITY & LOGS · ISO/IEC 27001, IEC 62443, NIST SP 800-53, ISO/IEC 42001 · OIML R 117-1, API MPMS, ISO 5167-1 custody metering · ICAO Doc 9303 & Annex 9, PAXLST, ISO 30107-1, WCO DM · FIPS 180-4, RFC 9162, RFC 3161, ISO 20022, WCAG 2.2 ALL 18 SPECIFICATIONS DESIGNED AGAINST IN ARCHITECTURE & CODE
Layer 03 · Service (10 standards) SERVICE SPECIFICATIONS · OPERATIONS & ASSURANCE · ISO 9001, ISO/IEC 20000-1 & ISO 22301 continuity · ISO 55001 lifecycle asset management & renewal · ISO/IEC 17025 calibration & assay laboratory competence · ISO 14001, ISO 45001, ISO 37001, ISO 19011, GDPR ALL 10 SPECIFICATIONS DESIGNED AGAINST IN OPERATIONS & TRANSFER
01 · Study specifications

Bankable diligence and reproducible uncertainty

Feasibility studies follow IFC Performance Standards, Equator Principles IV, JORC / NI 43-101 mineral disclosure discipline, EITI 2023 fiscal transparency and JCGM 100:2008 uncertainty propagation so lender credit committees receive institutional-grade evidence from the outset.

02 · System specifications

Defence in depth, legal metrology and open messaging

Operational technology zones obey IEC 62443, custody meters follow OIML R 117-1 and API MPMS, border and customs gateways adopt ICAO and WCO schemas, and tamper-evident ledgers implement NIST FIPS 180-4, IETF RFC 9162 and RFC 3161.

03 · Service specifications

Twenty-year operations, safety and integrity governance

24/7 operations centres structure incident and continuity drills around ISO/IEC 20000-1 and ISO 22301, asset renewals follow ISO 55001, assay labs align to ISO/IEC 17025, and procurement integrity is structured against ISO 37001 anti-bribery controls.

03 · Complete specification register

All 38 international standards designed against

Filter by programme layer or search by specification number, publisher or technical scope. Data loaded directly from the frozen Tie Wang standards register.

38 of 38 shown
Complete register of 38 standards designed against across Study, System and Service
Sourced
Specification Layer Publisher & year What it governs in a Tie Wang programme Status
ISO 31000:2018 study International Organization for Standardization (ISO) (2018) Principles, framework, and process for identifying, quantifying, and treating programme and enterprise risk. Designed against
IFC Performance Standards (2012) study International Finance Corporation (World Bank Group) (2012) Eight environmental and social risk standards applied to bankable project-finance studies, ESIA, resettlement, and biodiversity. Designed against
Equator Principles IV (2020) study Equator Principles Association (2020) Lender environmental, social, and climate risk due diligence and covenant conditions in project finance transactions. Designed against
JORC Code (2012) study Joint Ore Reserves Committee (JORC) (2012) Public reporting standards, competent-person sign-off, and classification of mineral resources and ore reserves. Designed against
NI 43-101 study Canadian Securities Administrators (2011) Technical report format, qualified-person responsibility, and disclosure rules for mineral feasibility studies. Designed against
ISO 14064-1:2018 study International Organization for Standardization (ISO) (2018) Organisational greenhouse gas accounting boundaries, quantification, and reporting for climate and carbon studies. Designed against
EITI Standard 2023 study Extractive Industries Transparency Initiative (EITI) (2023) Contract disclosure, beneficial ownership, production reporting, and revenue reconciliation across oil, gas, and mining. Designed against
OECD Due Diligence Guidance (3rd ed.) study Organisation for Economic Co-operation and Development (OECD) (2016) Five-step risk-based chain-of-custody and supply-chain due diligence for gold and critical minerals. Designed against
ISO 19650-1:2018 study International Organization for Standardization (ISO) (2018) Structured digital engineering information management across asset design, delivery, and operational handover. Designed against
JCGM 100:2008 (GUM) study Bureau International des Poids et Mesures (BIPM / JCGM) (2008) Statistical and analytical propagation of measurement uncertainty budgets and expanded uncertainty intervals. Designed against
ISO/IEC 27001:2022 system ISO / IEC (2022) Risk-based information security management systems, controls, and governance across national digital platforms. Designed against
IEC 62443 (series) system International Electrotechnical Commission (IEC) (2024) Network segmentation, zones, conduits, and security lifecycle controls for SCADA, metering, and operational technology. Designed against
ISO/IEC 42001:2023 system ISO / IEC (2023) Governance, risk assessment, model lifecycle oversight, and human accountability for artificial intelligence systems. Designed against
OIML R 117-1:2019 system International Organization of Legal Metrology (OIML) (2019) Accuracy classes, maximum permissible errors, and legal metrology verification of custody-transfer liquid flow meters. Designed against
API MPMS system American Petroleum Institute (API) (2024) Custody-transfer hydrocarbon flow metering, proving, automatic sampling, tank gauging, and fiscal quantity calculation. Designed against
ISO 5167-1:2022 system International Organization for Standardization (ISO) (2022) Design, installation, and uncertainty limits of differential-pressure flow measurement in industrial pipelines. Designed against
ICAO Doc 9303 (8th ed.) system International Civil Aviation Organization (ICAO) (2021) Physical specifications, contactless chip data structure, biometric encoding, and PKI authentication of ePassports. Designed against
ICAO Annex 9 (16th ed.) system International Civil Aviation Organization (ICAO) (2022) International civil aviation border clearance, Advance Passenger Information (API), and Passenger Name Record (PNR) obligations. Designed against
UN/EDIFACT PAXLST system UNECE / WCO / IATA / ICAO (2022) Standardised electronic message format for carrier transmission of Advance Passenger Information to border authorities. Designed against
ISO/IEC 30107-1:2023 system ISO / IEC (2023) Testing framework and metrics for anti-spoofing and presentation-attack detection in biometric border and identity gates. Designed against
WCO Data Model v4.1 system World Customs Organization (WCO) (2024) Harmonised customs declaration, cargo manifest, and cross-border single-window electronic data exchange. Designed against
ISO 20022 system International Organization for Standardization (ISO) (2013) Structured XML and JSON messaging for interbank payments, clearing, treasury sweeps, and payment-switch interoperability. Designed against
NIST FIPS 180-4 system National Institute of Standards and Technology (NIST) (2015) Cryptographic digest functions including SHA-256 and SHA-512 used for hash chaining and integrity verification. Designed against
IETF RFC 9162 system Internet Engineering Task Force (IETF) (2021) Append-only Merkle hash tree log structure, inclusion proofs, and consistency proofs for tamper-evident audit ledgers. Designed against
IETF RFC 3161 system Internet Engineering Task Force (IETF) (2001) Cryptographic binding of hash digests to trusted timestamps for non-repudiable evidence sealing. Designed against
W3C WCAG 2.2 system World Wide Web Consortium (W3C) (2023) Testable contrast, keyboard navigation, target-size, and assistive-technology requirements for public web interfaces. Designed against
ITU-T E.164 system International Telecommunication Union (ITU-T) (2010) Global telephone numbering structure underlying call-detail record collection, telecom routing, and bypass detection. Designed against
NIST SP 800-53 Rev. 5 system National Institute of Standards and Technology (NIST) (2020) Comprehensive catalogue of technical, operational, and privacy controls for sovereign government information systems. Designed against
ISO 9001:2015 service International Organization for Standardization (ISO) (2015) Process quality management, corrective action, auditability, and continual improvement across operations. Designed against
ISO/IEC 20000-1:2018 service ISO / IEC (2018) IT service level management, incident handling, change control, and 24/7 operations centre delivery. Designed against
ISO 22301:2019 service International Organization for Standardization (ISO) (2019) Disaster recovery, failover drills, recovery time objectives, and service continuity for critical national infrastructure. Designed against
ISO 55001:2014 service International Organization for Standardization (ISO) (2014) Lifecycle maintenance, renewal wave planning, and handover readiness for long-term physical and technical assets. Designed against
ISO/IEC 17025:2017 service ISO / IEC (2017) Impartiality, traceability, and technical competence of calibration laboratories, assay facilities, and metrological proving. Designed against
ISO 14001:2015 service International Organization for Standardization (ISO) (2015) Ongoing environmental compliance, monitoring, and impact mitigation during construction and multi-decade operations. Designed against
ISO 45001:2018 service International Organization for Standardization (ISO) (2018) Field crew safety, hazard elimination, and incident prevention across mines, ports, rail, and instrumentation sites. Designed against
ISO 37001:2025 service International Organization for Standardization (ISO) (2025) Anti-bribery controls, due diligence, whistleblowing, and governance across public-private concessions and procurement. Designed against
ISO 19011:2018 service International Organization for Standardization (ISO) (2018) Audit programme planning, evidence sampling, independence, and reporting for independent verification mandates. Designed against
EU Regulation 2016/679 (GDPR) service European Parliament and Council of the European Union (2016) Operational data governance, data minimisation, retention enforcement, breach notification, and controller accountability. Designed against

38 published international standards from ISO, IEC, OIML, API, ICAO, WCO, IETF, NIST, BIPM, IFC, EITI, OECD, W3C and EU, grouped into Study (10), System (18) and Service (10).

Source: Tie Wang canonical standards register (identical to /data/standards.json); every entry marked designed against

04 · Metrological & audit linkage

How physical measurement uncertainty ties to cryptographic proof

Toggle between OIML R 117-1 accuracy classes to compare permissible system tolerances across the custody-transfer evidence chain.

Custody-transfer measurement and audit chain combining OIML R 117-1, JCGM 100:2008 and FIPS 180-4
Sourced
01 · METER ALONE ±0.2% OIML R 117-1 MPE 02 · FULL SYSTEM ±0.3% At 15 °C & 101.325 kPa 03 · UNCERTAINTY k = 2..3 JCGM 100 root sum sq 04 · LEDGER SEAL SHA-256 FIPS 180-4 + RFC 9162 ACTIVE PROFILE: OIML CLASS 0.3 (CRUDE OIL & PIPELINE CUSTODY TRANSFER) · STANDARD REFERENCE ISO 5024:1999
View OIML R 117-1 class comparison table
OIML R 117-1 class Meter MPE Complete system MPE Typical custody application
Class 0.3 0.2% 0.3% Pipeline and marine custody transfer of crude oil and refined products
Class 0.5 0.3% 0.5% Bulk depot gantry loading, road tankers and general liquid fiscal metering

Four-stage chain: physical meter within 0.2% (Class 0.3) or 0.3% (Class 0.5), complete measuring system within 0.3% or 0.5% at 15 C and 101.325 kPa reference conditions, expanded uncertainty combined by root sum of squares under JCGM 100:2008, and SHA-256 ledger sealing.

Source: OIML R 117-1:2019; BIPM JCGM 100:2008 (GUM); ISO 5024:1999; NIST FIPS 180-4

05 · Next steps by audience

Trace these specifications into working systems and sectors

Inspect how international standards operate inside individual technologies, sectors and source records.

Public authority & technical regulator

Verify which international metrology, customs, aviation, security and auditing specifications govern the schedules of a national concession.

Inspect sovereign security controls →
Independent verifier & laboratory

Review how JCGM 100:2008 uncertainty budgets, ISO/IEC 17025 proving and SHA-256 hash chaining make operational figures legally defensible.

Inspect custody-transfer metrology →
Development lender & E&S counsel

Confirm how IFC Performance Standards, Equator Principles IV, EITI 2023 and ISO 37001 anti-bribery controls anchor bankability from the Study phase.

Open the three heats workbench →
Sector operator & systems engineer

See how IEC 62443 industrial zones, WCO Data Model v4.1 and ISO 20022 messaging prevent single-vendor lock-in during system integration.

Explore the technology stack →