Operable engineering instrument
Computed Live JCGM 100 RSS custody-transfer uncertainty budget
Adjust component standard uncertainties below to compute combined standard uncertainty (u_c), expanded uncertainty (U at k=2) and compliance against the OIML R 117-1 Class 0.3 limit (0.30%).
Combined standard u_c 0.109 %
Expanded uncertainty U 0.217 %
Statutory limit 0.30 %
Headroom / breach +0.083 %
GUM RSS VERDICT Within statutory accuracy limit · Custody-transfer certificate valid Dominant variance contributor: Meter repeatability (Type A)
Meter repeatability (Type A) 30.5% Master prover traceability 21.2% Temperature & CTL correction 13.6% Pressure, density & BS&W sampling 21.2% Inter-proving calibration drift 13.6% Source: Live BIPM JCGM 100:2008 root-sum-of-squares formula held against OIML R 117-1 Class 0.3 (0.30% MPE)