How does a national programme hold up under the lender, the auditor and time?

Sector · Flow: matter · measure Primary heat: auditor

Downstream fuel and products

Where do fuel excise duties, subsidy budgets and product quality leak between the import jetty and the retail pump, and how does software-first reconciliation close the gap?

01 · SOURCE Jetty & refinery Discharge at 15 °C 02 · GATES Depot gantry Preset & truck seal 03 · REGISTER Fuel ledger Excise & subsidy sync 04 · EXIT Forecourt delivery ATG dip vs dispatch 01 · SOURCE Jetty & refinery Discharge at 15 °C 02 · GATES Depot gantry Preset & truck seal 03 · REGISTER Fuel ledger Excise & subsidy sync 04 · EXIT Forecourt delivery ATG dip vs dispatch

01 · Downstream fuel physics & fiscal leakage

Downstream fuel leakage compounds across every depot, tanker and subsidy tier

Refined fuels carry high per-litre excise duties and, in many economies, targeted price subsidies or transit exemptions. When import discharge, depot loading gantries, road tankers and retail underground tanks sit on disconnected systems, transit diversion, adulteration and unbilled releases drain both Treasury revenue and subsidy budgets.

Global refining capacity (2023) Sourced
Sourced fuel-1 · 2023 Global oil refining capacity was estimated at 103.5 million barrels per day in 2023, according to the U.S. Energy Information Administration. U.S. Energy Information Administration, Outlook on Global Refining to 2028 (2024-08) Open public record ↗

Baseline global crude distillation refining capacity estimated by the U.S. Energy Information Administration.

Global fossil fuel subsidies (2022) Sourced
Sourced fuel-5 · 2022 Global fossil fuel subsidies rose from 5.4% of GDP in 2015 to 7.1% of GDP in 2022, according to IMF data reported by the World Bank in 2024. World Bank (citing International Monetary Fund), Fuel Subsidy Reforms: Lessons from the Literature (2024-10) Open public record ↗

Total explicit and implicit fossil fuel subsidies as a share of global GDP (IMF data via World Bank 2024).

Explicit underpricing share Sourced
Sourced fuel-6 · 2022 Explicit supply-cost underpricing accounted for 18% of global fossil fuel subsidies in 2022, while implicit environmental and tax subsidies accounted for 82%, according to IMF data reported by the World Bank in 2024. World Bank (citing International Monetary Fund), Fuel Subsidy Reforms: Lessons from the Literature (2024-10) Open public record ↗

Share of global fuel subsidies attributable to direct supply-cost underpricing (World Bank / IMF 2024).

Custody-transfer class limit Sourced
Sourced met-1 · 2019 Maximum permissible error of an accuracy class 0.3 dynamic liquid measuring system (custody transfer of crude oil and products) OIML R 117-1:2019, Dynamic measuring systems for liquids other than water Open public record ↗

OIML R 117-1:2019 accuracy class 0.3 maximum permissible error for dynamic petroleum liquid systems.

Downstream fuel distribution is a high-velocity mass-balance problem governed by thermal expansion and tax differentials. Worldwide crude refining capacity stood at Sourced fuel-1 · 2023 Global oil refining capacity was estimated at 103.5 million barrels per day in 2023, according to the U.S. Energy Information Administration. U.S. Energy Information Administration, Outlook on Global Refining to 2028 (2024-08) Open public record ↗ in 2023, with another Sourced fuel-2 · 2024 Between 2.6 million and 4.9 million barrels per day of new refining capacity are estimated to enter service over 2024 to 2028, according to the U.S. Energy Information Administration. U.S. Energy Information Administration, Outlook on Global Refining to 2028 (2024-08) Open public record ↗ of additions projected over 2024 to 2028, alongside growing traded volumes of natural gas plant liquids such as United States NGPL exports reaching Sourced fuel-3 · 2025 United States natural gas plant liquids exports reached a record 3.1 million barrels per day in 2025, according to the U.S. Energy Information Administration. U.S. Energy Information Administration, Natural gas plant liquids exports reached record highs in 2025 (2026) Open public record ↗ and propane exports hitting Sourced fuel-4 · 2025 United States propane exports averaged a record 1.8 million barrels per day in 2025, according to the U.S. Energy Information Administration. U.S. Energy Information Administration, Natural gas plant liquids exports reached record highs in 2025 (2026) Open public record ↗ . Across emerging and frontier markets, imported petrol, diesel, jet fuel and LPG concentrate through a handful of coastal jetties, single-point moorings and strategic tank farms before fanning out to hundreds of depots and thousands of retail stations.

Fiscal vulnerability intensifies wherever price subsidies or multi-tier excise rates exist. World Bank analysis of IMF data shows total global fossil fuel subsidies reached Sourced fuel-5 · 2022 Global fossil fuel subsidies rose from 5.4% of GDP in 2015 to 7.1% of GDP in 2022, according to IMF data reported by the World Bank in 2024. World Bank (citing International Monetary Fund), Fuel Subsidy Reforms: Lessons from the Literature (2024-10) Open public record ↗ in 2022, with explicit supply-cost underpricing accounting for Sourced fuel-6 · 2022 Explicit supply-cost underpricing accounted for 18% of global fossil fuel subsidies in 2022, while implicit environmental and tax subsidies accounted for 82%, according to IMF data reported by the World Bank in 2024. World Bank (citing International Monetary Fund), Fuel Subsidy Reforms: Lessons from the Literature (2024-10) Open public record ↗ of that total. Whenever transit fuel bound for landlocked neighbours, marine bunkers or subsidised domestic kerosene trades at a lower tax rate than road diesel, the arbitrage reward for paper diversion exceeds the cost of physical smuggling. Empirical tax compliance research underscores the mechanism: self-reported liabilities suffer up to Sourced tax-5 · 2022 Net misreporting rate on income subject to little or no information reporting US Internal Revenue Service, Publication 1415, Federal Tax Compliance Research: Tax Gap Estimates for Tax Years 2014-2016 (with TY 2017-2019 projections, August 2022) Open public record ↗ net misreporting under weak third-party reporting, compared with Sourced tax-3 · 2022 Net misreporting rate on income subject to substantial information reporting and withholding US Internal Revenue Service, Publication 1415, Federal Tax Compliance Research: Tax Gap Estimates for Tax Years 2014-2016 (with TY 2017-2019 projections, August 2022) Open public record ↗ when independent third-party reporting and withholding bind the transaction.

A hardware-first approach that attempts to fit every retail station with new meters simultaneously stalls on capital cost and civil disruption. Tie Wang starts at the narrowest choke points: an independent national fuel register binds every import bill of lading and refinery batch to existing depot loading-rack preset controllers, automated tank gauges and customs transit declarations, correcting all volumes to Sourced met-3 · 1999 Standard reference conditions for petroleum and liquid petroleum products ISO 5024:1999, Petroleum liquids and liquefied petroleum gases, measurement, standard reference conditions Open public record ↗ under Sourced std-5024 · 1999 Petroleum measurement: standard reference conditions ISO 5024:1999 Open public record ↗ . Only after live reconciliation isolates specific unmetered depots or high-loss transit corridors are custody meters, electronic seals or molecular marking equipment deployed in targeted tranches.

02 · Public-record evidence

Refining scale, subsidy distortion and third-party reporting compliance

Switch between global downstream subsidy and refining indicators and empirical tax misreporting gaps when third-party telemetry is absent.

Global downstream market indicators and third-party reporting compliance benchmarks
Sourced
DECOMPOSITION OF GLOBAL FOSSIL FUEL SUBSIDIES IN 2022 (% SHARE) Implicit tax & env. share 82% Explicit underpricing share 18% Total subsidies (% GDP) 7.1% GDP TOTAL SUBSIDIES ROSE FROM 5.4% OF GDP IN 2015 TO 7.1% IN 2022 (FUEL-5, FUEL-6)

View A shows explicit supply-cost fuel subsidies at 18% versus implicit subsidies at 82% of the 7.1% global GDP total (World Bank/IMF 2024). View B shows IRS net misreporting falling from 55% with little third-party reporting to 6% with reporting alone and 1% with reporting plus withholding.

Source: World Bank / IMF (2024); U.S. EIA (2024 to 2026); US IRS Publication 1415 (2022)

Inspect accessible data table for this exhibit

Fuel subsidy split (World Bank / IMF)

Indicator Public-record figure Context
Implicit tax & env. share 82% Unpriced environmental and foregone consumption-tax component (fuel-6).
Explicit underpricing share 18% Direct supply-cost underpricing creating immediate fiscal arbitrage (fuel-6).
Total subsidies (% GDP) 7.1% GDP Global fossil fuel subsidies as a share of world GDP in 2022 (fuel-5).

Reporting visibility gap (IRS Pub. 1415)

Indicator Public-record figure Context
Little / no third-party data 55% Self-declared liabilities without independent meter or register cross-check (tax-5).
Third-party reporting only 6% Automated independent reporting without automated collection sweep (tax-4).
Reporting + withholding 1% Independent reporting coupled with Treasury-first collection sweep (tax-3).

03 · Study, System, Service

How Study, System and Service close the depot-to-pump balance

Connecting existing import terminals and depot gantries establishes national mass-balance visibility before any new field meters are bought.

LAYER 01 · Study S-02
CORRIDOR & DEPOT BASELINE MAP IMPORT JETTIES, TANK FARMS & EXCISE TIERS JETTY AUDIT EXCISE RULES LOSS MODEL · Audit import jetties, pipelines, storage tanks and gantry racks · Quantify temperature, transit and subsidy arbitrage spreads · Size per-litre fee waterfall with Treasury duties swept first
LAYER 02 · System S-02
NATIONAL FUEL RECONCILIATION LEDGER ONE BATCH KEY FROM SHIP MANIFEST TO TANKER SEAL GANTRY FEED 15 °C ENGINE TRANSIT SEALS · Read depot loading presets and ATG levels via read-only APIs · Normalise every litre to 15 °C and reconcile against customs · Bind sealed transit tankers to border exit confirmations
LAYER 03 · Service S-02
EXCEPTION DESK & PROVER OPERATIONS CALIBRATION SCHEDULES, FIELD INSPECTIONS & TRANSFER VARIANCE DESK MOBILE PROVERS LOCALISATION · Route depot stock discrepancies to customs and energy officers · Run scheduled volumetric proving and sample testing · Transfer software, calibration rigs and academy cohorts at term

Study: quantify the physical network and fiscal spreads

Tie Wang audits import jetties, inland storage depots, existing automatic tank gauges and gantry preset controllers alongside national excise and subsidy schedules. The financial model tests fee stability under demand shocks and ranks depots by volume share so deployment focuses on the top bottlenecks first.

System: bind every litre from jetty discharge to tanker release

An append-only sovereign register assigns one parcel key from vessel discharge through storage tank movements to road-tanker loading tickets. Existing depot automation systems feed copy-only lifting records while electronic seals and border scans close the loop on duty-free transit cargoes.

Service: disciplined exception routing with public-officer primacy

Operations analysts monitor live depot reconciliation, flagging unclosed transit dispatches, tank stock losses beyond allowable evaporation bands and offline loading meters. Evidence dossiers go to named revenue and energy regulators, who alone issue assessments, fines or licence suspensions.

04 · Reconciliation tolerances & standards

Four mass-balance gates separating normal evaporation from diversion

Select a downstream control point to inspect the illustrative tolerance, exception trigger and evidence-led hardware upgrade path.

Active chokepoint Marine tanker to coastal tank farm
Primary control metric ±0.3% shore vs outturn (illus.)
Variance signal Repeated shore-tank receipt shortfall against bill-of-lading discharge figures
Register action (software first) Join vessel ullage, shore ATG trend and customs manifest into one sealed discharge audit
Hardware trigger (evidence led) Install custody-transfer Coriolis or turbine skid on unmetered import manifolds
Illustrative downstream fuel reconciliation gates from jetty to forecourt
Illustrative
GATE 01 · IMPORT Jetty discharge ±0.3% Shore meter vs tank dip (illustrative) GATE 02 · DEPOT Tank balance ±0.25% Opening + in - out (illustrative) GATE 03 · GANTRY Truck loading 15 °C Compensated dispatch ID (illustrative) GATE 04 · TRANSIT Exit closure 72 h Border seal verification (illustrative)

Four illustrative downstream gates: Gate 01 jetty discharge within 0.3% class limit; Gate 02 tank farm stock reconciliation within 0.25% monthly band; Gate 03 gantry loading to 15 °C standard litres within 0.2% meter accuracy; Gate 04 sealed transit closure within 72 hours.

Illustrative Source: Tie Wang illustrative downstream fuel assurance architecture (all tolerances illustrative; statutory bands set by the Authority)

International standards designed against in downstream fuel programmes Sourced
Standard (designed against)Programme layerOperational role in sector
OIML R 117-1:2019Depot & jetty meteringAccuracy class 0.3 limits and proving protocols for liquid fuel loading racks and pipelines.
ISO 5024:1999Thermal correctionReference state (15 °C, 101.325 kPa) eliminating temperature-driven volume arbitrage.
API MPMSTank gauging & tablesCalibration tables, automatic tank gauging (ATG) accuracy and temperature volume correction factors.
ISO 18185 seriesTransit sealingElectronic cargo and valve seal telemetry for bonded cross-border fuel tankers.
WCO SAFE FrameworkCustoms facilitationPre-arrival electronic cargo data exchange and risk-based border clearance.
FIPS 180-4 (SHA-256)Evidence ledgerImmutable hash chaining sealing every depot dispatch ticket and excise reconciliation statement.

Source: OIML, ISO, API and WCO standard publications (designed against; Tie Wang claims no certification)

05 · Project fit, rollout & evidence boundaries

Start with coastal depots and existing loading controllers

In most markets, over 80% of national fuel supply passes through a small cluster of coastal import terminals and primary inland depots. Connecting those nodes first delivers rapid fiscal coverage.

06 · Next steps by audience

Select your mandate to inspect first documents and next routes

Every party to a national programme carries a distinct legal and financial risk. Filter by role or inspect all four tracks below.

Public authority

Protect excise duties and subsidy budgets from day ninety

Deploy a sovereign fuel register across primary depots while keeping price regulation, licensing and tax enforcement strictly inside public agencies.

First document: National Depot Register & Electronic Dispatch Mandate Brief

Inspect illustrative fuel structure →

Lender & investor

Low initial capital exposure tied to inelastic national fuel demand

Test how phased gantry upgrades and automated fee settlement cut ramp-up capital risk before hardware tranches commit.

First document: Downstream Concession Cash-Flow & Tranche Model

Simulate the payment waterfall →

Operator

Zero queueing delay at loading gantries

Connect existing terminal automation systems through read-only APIs so compliant oil marketers clear tankers faster with verifiable digital delivery notes.

First document: Terminal Automation Read-Only Connector Specification

Inspect reconciliation engine →

Local partner & verifier

Build national calibration crews and independent audit capacity

Pair local permitting and depot field teams with Tie Wang ledger engineering and metrological proving academies.

First document: Localisation & Proving Operations Plan