Register-first deployment planner
How much upfront capital is avoided and how quickly does verified coverage start when a national register precedes phased hardware?
- Capex avoided
- USD 10.56m
- First revenue
- Day 90
- Day 730 cash
- USD 6.54m
01 · Live instrument
Configure your illustrative programme
Inputs
IllustrativePorts, borders, buying centres, depots or nodes in scope (4 to 120).
Share with meters, scales or scanners connectable via signed APIs (0% to 90%).
Calendar days from contractual effective date to live register (30 to 180).
Greenfield sites equipped per 90-day evidence-led hardware tranche (2 to 24).
Determines when verified service fees begin in the payment waterfall.
Computed outputs
ComputedCumulative net cash trajectory over 24 months (USD millions)
Illustrative comparison of Register-first (violet) against Equipment-first (iron dash).
Method note, equations and assumptions
This model evaluates two deployment architectures over a 24-month (730-day) window using deterministic monthly cashflow steps. Every unit parameter is illustrative and stated in full so any reviewer can reproduce the result independently:
- Software core CAPEX: USD 1.80m covering sovereign dual-site hosting, append-only ledger, reconciliation rules and public-officer portals, expended up to the selected register go-live day.
- Existing-instrument connectors: USD 0.04m per site for documented, revocable API or data-diode integration across existing meters, scales or scanners, commissioned within 45 days of register launch.
- Greenfield hardware bay: USD 0.55m per site. Under Register-first, only sites lacking existing instruments are equipped, phased in sequential 90-day tranches of the chosen tranche size. Under Equipment-first, 80% of all-site hardware CAPEX is committed across a 240-day procurement lead before initial site commissioning.
- Operating costs and fee stream: USD 0.14m/month base operations centre plus USD 0.008m/month per active site. Verified fee revenue is modelled at USD 0.045m/month per fully instrumented site, with register-only sites weighted at 45% until site connectors or hardware are active.
Limitations: the model illustrates relative cashflow timing and upfront capital exposure; it does not include debt interest, inflation indexing, taxes or country-specific statutory tariffs, and does not constitute a commercial offer.
Sources and basis
- Delivery architecture: Tie Wang register-first delivery framework (pre-effective readiness, 90-day register go-live, phased hardware tranches; all figures illustrative).
- Pure computation model: Deterministic browser calculation model, unit-tested for monotonicity, bounds, URL serialisation and CSV/Markdown export.
- Empirical reporting context: Kleven et al. (Econometrica 2011) and IRS Publication 1415 (August 2022) on third-party reporting versus self-declaration. [link ↗]
02 · Day-by-day status
What is live by day across both plans
| Day | Register-first status | RF live sites | RF cum. cash | Equipment-first status | EF live sites | EF cum. cash |
|---|---|---|---|---|---|---|
| Day 30 | Pre-live ledger build, sovereign hosting & interface tests | 0 | USD -0.60m | Civil works, procurement and factory testing (zero live coverage) | 0 | USD -1.55m |
| Day 90 | National register live; existing-instrument connectors onboarding | 24 | USD -1.39m | Civil works, procurement and factory testing (zero live coverage) | 0 | USD -4.64m |
| Day 180 | Register + connectors live; evidence-led hardware tranches rolling out | 24 | USD -3.43m | Civil works, procurement and factory testing (zero live coverage) | 0 | USD -9.27m |
| Day 365 | Full national register, connectors and phased hardware in steady operation | 24 | USD -1.69m | Partial hardware bays commissioning; register awaiting rollout completion | 18 | USD -12.52m |
| Day 730 | Full national register, connectors and phased hardware in steady operation | 24 | USD 6.54m | Full hardware estate operating after heavy upfront capital outlay | 24 | USD -5.39m |
03 · Interpreting the curve