Embed an explicit fee cap and day-one State-first sweep inside the escrow agreement so upside volume accrues to the Treasury.
Escrow account and payment-priority schedule
How are verified revenues split between the Treasury, operating costs and debt service?
01 · Live escrow waterfall
Gross verified statutory revenues passing through the collection escrow account.
Share swept unconditionally to Treasury at Tier 1 before partner deductions (50% to 95%).
Annual ceiling on partner fee pool; any excess sweeps automatically to Treasury.
Operations centres, field assurance crews, hosting and independent verification costs.
Scheduled principal and interest paid out of the partner fee pool after opex.
Debt service reserve account target balance (25% annualised replenishment slice).
Funded sinking reserve for mid-term hardware and software refresh waves.
Scales verified gross collections from 50% contraction to 150% boom.
Bars scale proportionally to gross verified collections; green marks Treasury sweeps ahead of partner costs.
Every dollar entering the verified escrow account clears strict rank-ordered rules with zero leakage and zero sovereign budget subsidy:
Limitations: evaluates a single steady-state operating year without drawing down accumulated prior-year DSRA balances or modelling progressive corporate tax tiers on partner dividends.
02 · Priority ledger
| Rank | Waterfall tier | Recipient | Required (USD m) | Paid (USD m) | Shortfall (USD m) | Share of gross |
|---|---|---|---|---|---|---|
| 1 | State-first statutory sweep | Treasury | 164.00 | 164.00 | 0.00 | 82.0% |
| 2 | Fee-cap excess returned to State | Treasury | 0.00 | 0.00 | 0.00 | 0.0% |
| 3 | Operating and assurance costs | Operations | 12.00 | 12.00 | 0.00 | 6.0% |
| 4 | Senior debt service | Lenders | 14.00 | 14.00 | 0.00 | 7.0% |
| 5 | DSRA replenishment allocation | Reserves | 1.75 | 1.75 | 0.00 | 0.9% |
| 6 | Lifecycle renewal reserve | Reserves | 2.50 | 2.50 | 0.00 | 1.3% |
| 7 | Distributable equity surplus | Equity | 5.75 | 5.75 | 0.00 | 2.9% |
03 · Volume envelope
Treasury still receives its full 82% statutory sweep first; partner equity locks up to protect senior debt.
| Regime | Partner fee DSCR | Treasury share | Engineering implication |
|---|---|---|---|
| Volume contraction (70%) | 0.94x | 82.0% | Treasury still receives its full 82% statutory sweep first; partner equity locks up to protect senior debt. |
| Base verified volume (100%) | 1.71x | 82.0% | Operating costs, debt service, DSRA and renewal reserves are funded cleanly with zero budget guarantee required. |
| Volume surge (135%, cap hit) | 2.00x | 85.2% | Once partner fees hit the contractual ceiling, USD 8.60m in excess revenue sweeps directly back to the Treasury. |
Comparison of partner DSCR, Treasury effective share and cap excess across contraction, base and volume-surge scenarios.
Source: Tie Wang waterfall engine (deterministic browser model)
04 · Self-funding discipline
World Bank research identifies a tax-to-GDP threshold around Sourced pfin-1 · 2024 Tax-to-GDP threshold around which future inclusive economic growth improves significantly across countries World Bank, Taxing for Growth: Thresholds and Inclusive Development, June 2024 Open public record ↗ where future inclusive economic growth improves significantly. Yet ministries of finance are rightly reluctant to issue sovereign guarantees or budget transfers for untested assurance contracts.
In a State-first waterfall, the fee arises solely upon a verified, sealed transaction in the evidence ledger. The Treasury sweeps its statutory share first, leaving zero budget arrears and zero contingent liability on the public balance sheet.
Concessions without upper fee caps invite political renegotiation whenever commodity prices or trade volumes surge. Setting a clear contractual cap that sweeps 100% of excess fee cash straight back to the Treasury keeps private returns aligned with capital at risk while strengthening public durability across the full term.
05 · Action by counterparty
Embed an explicit fee cap and day-one State-first sweep inside the escrow agreement so upside volume accrues to the Treasury.
Escrow account and payment-priority schedule
Verify that senior debt service sits ahead of reserves and equity inside the capped partner fee pool with a 1.20x lock-up test.
Lender waterfall covenant and DSRA mechanics
Confirm that fixed operating costs and renewal reserves remain covered even under a 30% verified volume contraction.
Downside operating liquidity stress check
Use transparent escrow splits to explain to parliamentary and audit committees why no budget appropriation is needed.
Public-finance self-funding briefing note