01. Structured fact ingestion
Every institutional fact enters a versioned JSON file with publisher, title, year, evidence grade, verbatim quote and HTTPS URL. Duplicate identifiers or non-HTTPS links fail validation before compilation starts.
Proof · Verification & modelling methods
Auditable pipelineEvery numeral on this site carries an explicit provenance status and passes automated build-time audits. No statistic enters prose unlinked, and no interactive instrument ships without deterministic unit tests.
01 · Taxonomy of truth
A reader should never have to guess whether a number is a measured international standard, a computed tool output or an illustrative design example.
Every entry validated for unique canonical ID, publisher and direct HTTPS URL.
Sourced, Derived, Computed, Assumed and Illustrative.
Statistical (Type A) and calibration/prior (Type B) uncertainty propagation.
Expanded uncertainty factor k applied before flagging custody variance.
In conventional advisory publications, real macroeconomic statistics, unverified industry anecdotes and worked illustrative examples frequently sit in the same paragraph without visual separation. When a ministry official or a credit officer lifts a sentence into a cabinet memo, an illustrative parameter can accidentally harden into a binding expectation.
Tie Wang enforces separation mechanically. Every external figure renders through a shared inline citation element bound to the canonical register (tagged as sourced). Interactive working instruments under the Instruments hub and operable engineering consoles on Technology discipline pages mark their live deterministic outputs as computed and their input panels as interactive controls, printing full equations and unit assumptions beside the chart. Build-time register counts carry a derived marker, and worked architectural examples carry both a visible Illustrative badge and an illustrative provenance tag (static library monographs and prose tables use only the four non-interactive statuses: Sourced, Derived, Assumed and Illustrative). After static HTML compilation, the claims auditor scans every remaining prose numeral of 10 or greater against the explicit claims ledger (with no context-free global allowlist of unrelated fact figures) and fails the build if a single figure is unledgered or if a computed-output marker appears on a static non-instrument page.
The same rule extends into live operational platforms built under the System layer. A custody-transfer meter that loses power or a field scanner offline during a link failure never fabricates an interpolated reading to keep a dashboard green. Under Tie Wang's truth-in-every-figure discipline, an unmeasured event is recorded as unknown, logged to the availability queue and reconciled only when calibrated evidence returns.
Similarly, on this public site, where real-world data cannot be disclosed without breaking client-blind governance (such as country-specific fee rates, past contract sizes or operator throughput), no synthetic track record is invented. Illustrative models state their exact parameters openly so any analyst can inspect and override them.
| Status label | Qualification rule | Build-time mechanical check | Typical site usage |
|---|---|---|---|
| Sourced | Published by a named institution, standards body, agency or peer-reviewed paper with date and direct HTTPS URL. | Fact register validator checks unique canonical ID, publisher, direct HTTPS URL and forbidden-text clearance; inline citations are tagged as sourced. | OIML R 117-1 accuracy class 0.3 (0.3% MPE); UNCTAD extractive under-invoicing share (77%). |
| Derived | Arithmetic complement, count or aggregation computed deterministically from verified sourced or canonical site registers. | Build-time derived register counts are tagged as derived and are cross-checked by automated dataset parity tests. | 23% non-gold extractive share (100% minus 77%); 160 controlled glossary terms. |
| Computed | Calculated live in the browser by a pure deterministic instrument model directly from inputs visible to the visitor. | Restricted to interactive browser models (the 18 standalone instruments under /instruments/ and operable engineering consoles on /technology/*), each verified by automated deterministic unit tests. Never used on static monographs or prose tables. | Register-first deployment planner CAPEX avoided and Day-730 cumulative net cash. |
| Assumed | Explicit modelling input carrying a stated sensitivity range so readers can test upside and downside impact. | Automated claims audit fails the build if any assumed ledger row omits a sensitivity range. | Equipment-first procurement lead window or sensitivity bounds inside project models. |
| Illustrative | Generic engineering parameter or worked example illustrating architecture without asserting a real project or fee. | Must carry a visible Illustrative chip on every Tie Wang exhibit or scenario block (tagged as illustrative) and register in the claims ledger. | 90-day register launch window; 15 to 25 year illustrative concession horizon. |
Source: Tie Wang site architecture (truth and verification standard)
02 · Interactive status inspector
Select any stage of the verification chain to inspect the exact failure conditions that block a defective page from shipping.
Every institutional fact enters a versioned JSON file with publisher, title, year, evidence grade, verbatim quote and HTTPS URL. Duplicate identifiers or non-HTTPS links fail validation before compilation starts.
Interactive tools separate calculation logic cleanly into pure deterministic modules verified by automated unit tests. Tests assert economic invariants (such as register-first lowering upfront capital when existing instruments rise) and verify that URL parameters and CSV exports round-trip deterministically.
Rather than trusting source templates, the claims auditor inspects the compiled HTML directory that visitors actually download. Only explicitly tagged sourced inline facts, build-time derived register counts, labelled illustrative panels and live working-instrument computed outputs (allowed only on interactive instrument routes) are partitioned by provenance tag; any unledgered prose numeral, misused computed badge on a static monograph or assumed claim lacking a sensitivity range exits non-zero.
Every shipped text, JSON, CSS and SVG file is scanned against the forbidden list of restricted entities, personal names and dash punctuation. Headless Chromium and WebKit then scroll compiled pages to detect text clipping, overflow or frame tremble.
03 · How working models are tested
Whether delivered as a browser instrument or a bankable Excel workbook recalculated in LibreOffice, every Tie Wang model must survive identical structural tests.
Empirical studies across 258 transport projects document average cost escalation of 45% in rail and 34% in fixed links (arXiv:1304.4476); large IT projects average 27% cost overrun with one-in-six outliers averaging 200% (arXiv:1304.0265), while 18% of 1,355 public-sector IT projects are outliers exceeding 25% cost overrun (arXiv:1304.4525).
Source: Flyvbjerg, Holm and Buhl (Transport Reviews, N=258 projects, arXiv:1304.4476); Flyvbjerg and Budzier (Harvard Business Review / Oxford, N=1,471 IT projects, arXiv:1304.0265); Budzier and Flyvbjerg (Oxford public-sector IT study, N=1,355 projects, arXiv:1304.4525)
| Verification gate | What it inspects | Condition that fails the build |
|---|---|---|
| Deterministic model suites | Every pure calculation model and dataset serialiser built into the site. | Non-monotonic output, out-of-bounds parameter leak, broken URL state encoding or invalid CSV/JSON. |
| Fact base validator | Every structured fact register loaded by the site. | Duplicate fact ID, missing publisher/value/label, non-HTTPS URL or forbidden-term match. |
| Claims audit | Every numeral of 10 or greater in visible compiled HTML text outside explicitly tagged sourced, derived, illustrative or working-instrument computed regions. | Any unledgered prose numeral, a computed-status marker placed outside a working instrument, invalid status value or assumed claim missing a sensitivity range. |
| Client-blind & style gate | Every shipped HTML, JS, JSON, CSS, SVG, TXT and XML file in the compiled site. | Any client, country of engagement, personal name, invented email, filler text or em/en dash. |
| Motion & browser stability scans | CSS stylesheets, built HTML blocks and live headless browser scroll frames. | Missing motion on any block, repeated adjacent entrance, clipping, horizontal overflow or frame tremble. |
Source: Tie Wang automated build verification pipeline
04 · Metrology & stochastic discipline
Single-point estimates fail under physical measurement noise and correlated macroeconomic shocks.
In physical custody-transfer sectors (crude oil, refined fuels, mineral weighbridges, gold assay), every instrument carries finite uncertainty. Following BIPM JCGM 100:2008 (GUM), Tie Wang structures uncertainty budgets across Sourced ref-met-1 · 2008 Under the international Guide to the Expression of Uncertainty in Measurement (JCGM 100:2008), combined standard uncertainty is obtained by combining component variances (root sum of squares for uncorrelated inputs), according to the BIPM. Bureau International des Poids et Mesures (BIPM / JCGM), Evaluation of measurement data: Guide to the expression of uncertainty in measurement (JCGM 100:2008) (2008-09) Open public record ↗ (statistical Type A repeatability and calibration/reference Type B bounds), combines independent variances by root sum of squares, and multiplies by an expanded coverage factor of Sourced ref-met-2 · 2008 Expanded measurement uncertainty multiplies combined standard uncertainty by a coverage factor k, which is typically in the range 2 to 3, according to BIPM JCGM 100:2008. Bureau International des Poids et Mesures (BIPM / JCGM), Evaluation of measurement data: Guide to the expression of uncertainty in measurement (JCGM 100:2008) (2008-09) Open public record ↗ before comparing the envelope against statutory OIML R 117 accuracy classes ( Sourced ref-met-3 · 2019 OIML R 117-1 classifies dynamic measuring systems for liquids other than water into four accuracy classes: 0.3, 0.5, 1.0, and 1.5, according to the International Organization of Legal Metrology. International Organization of Legal Metrology (OIML), OIML R 117-1: Dynamic measuring systems for liquids other than water, Part 1 (2019) Open public record ↗ ).
No variance alert routes to a public officer unless the observed discrepancy exceeds the combined physical uncertainty band. That discipline protects legitimate operators from false alarms while giving revenue authorities defensible proof when genuine diversion occurs.
Standard project spreadsheets often vary revenue by plus or minus 10% in isolation while holding financing draws, tax sweeps and renewal reserves frozen. Real shocks arrive together: commodity price drops coincide with volume slowdowns and commissioning delays. Across Sourced mc-1 · 2004 Nine out of ten major transport infrastructure projects experience cost escalation across a 20-nation sample of 258 projects worth US$90 billion, according to peer-reviewed transport research archived on arXiv. Transport Reviews (arXiv:1304.4476), What Causes Cost Overrun in Transport Infrastructure Projects? (2013-04) Open public record ↗ , empirical infrastructure studies report Sourced mc-2 · 2004 Average real cost escalation reached 45% for rail projects (standard deviation 38 percentage points) in the 258-project global transport reference class, according to Transport Reviews research archived on arXiv. Transport Reviews (arXiv:1304.4476), What Causes Cost Overrun in Transport Infrastructure Projects? (2013-04) Open public record ↗ average cost escalation in rail and Sourced mc-3 · 2004 Average real cost escalation reached 34% for bridges and tunnels (standard deviation 62 percentage points) in the 258-project global transport reference class, according to Transport Reviews research archived on arXiv. Transport Reviews (arXiv:1304.4476), What Causes Cost Overrun in Transport Infrastructure Projects? (2013-04) Open public record ↗ in fixed links, while large software builds average Sourced sw-1 · 2011 Across a sample of 1,471 information technology projects, the average cost overrun was 27%, according to empirical research archived on arXiv. Harvard Business Review / Saïd Business School (arXiv:1304.0265), Why Your IT Project May Be Riskier Than You Think (2013-04) Open public record ↗ cost overruns.
Tie Wang therefore re-solves the complete financial model across correlated distributions, checking debt service coverage ratios, cash traps and waterfall sweeps at every draw. Checks are proved able to fail by injecting deliberate balance breaks during audit validation.
05 · What is not yet verified & next steps
Inspect all cited public-record origins and evidence grades directly on the provenance wall.
Open Sources wall →Operate a unit-tested working instrument and export its exact assumptions as CSV or Markdown.
Run working planner →Download the full fact base, glossary and standards register compiled at build time.
Open Data downloads →Review how the three heats apply these methods across Study, System and Service.
Read the three heats →