Evaluate how tariff indexation and volume-sharing corridors narrow the return fan without transferring fiscal upside away.
Risk-allocation term sheet with P10/P90 bounds
What is the P10 to P90 distribution of project equity returns under correlated shocks?
01 · Seeded simulation
Total initial project capital cost financed by senior debt and equity (USD 20m to 600m).
Leverage ratio at 8.0% fixed senior interest over up to 12 years (20% to 80%).
Expected annual revenue before stochastic draws (USD 10m to 300m).
Expected annual operating costs as a share of base revenue (20% to 70%).
Annual standard deviation of throughput and tariff realisations (0% to 35%).
Annual standard deviation of operating and energy inputs (0% to 25%).
Positive values act as a natural hedge; negative values represent cost inflation during revenue slumps.
Operating horizon over which cumulative equity cashflows accrue (10 to 25 years).
Outer band: P10 to P90 · Inner band: P25 to P75 · Solid line: P50 median · Dashed line: zero-volatility base.
Each run executes 400 independent multi-year paths from a deterministic Mulberry32 generator (seed 2026) using a Box-Muller standard normal transform and two-factor Cholesky correlation:
Limitations: uses independent annual shocks rather than multi-year autocorrelated business cycles, omits debt refinancing and tax-loss carryforwards, and serves as a screening fan rather than a bankable valuation.
02 · Fan coordinates
| Year | P10 (downside) | P25 | P50 (median) | P75 | P90 (upside) | Zero-vol base |
|---|---|---|---|---|---|---|
| Year 0 | -49.00 | -49.00 | -49.00 | -49.00 | -49.00 | -49.00 |
| Year 1 | -42.32 | -39.14 | -36.50 | -33.09 | -30.22 | -36.13 |
| Year 2 | -31.12 | -27.47 | -23.38 | -19.44 | -15.37 | -23.26 |
| Year 3 | -21.06 | -16.07 | -11.07 | -5.87 | -1.11 | -10.40 |
| Year 4 | -9.19 | -3.75 | 2.19 | 8.30 | 12.80 | 2.47 |
| Year 5 | 3.12 | 7.53 | 14.70 | 21.70 | 27.45 | 15.34 |
| Year 6 | 14.77 | 20.05 | 27.77 | 35.66 | 41.68 | 28.21 |
| Year 7 | 27.02 | 33.44 | 41.51 | 49.11 | 57.12 | 41.07 |
| Year 8 | 38.91 | 46.10 | 54.48 | 62.39 | 70.61 | 53.94 |
| Year 9 | 51.04 | 58.65 | 67.07 | 77.08 | 85.89 | 66.81 |
| Year 10 | 62.84 | 71.04 | 80.64 | 89.31 | 98.64 | 79.68 |
| Year 11 | 74.45 | 84.89 | 94.01 | 102.41 | 112.76 | 92.55 |
| Year 12 | 87.17 | 96.40 | 106.27 | 116.36 | 127.43 | 105.41 |
| Year 13 | 107.67 | 118.00 | 128.25 | 139.56 | 150.10 | 127.94 |
| Year 14 | 130.91 | 139.30 | 150.49 | 162.91 | 174.37 | 150.47 |
| Year 15 | 152.84 | 161.99 | 172.96 | 186.83 | 197.92 | 173.00 |
03 · Correlation sensitivity
Tight revenue band keeps even the P10 downside comfortably positive, matching institutional core infrastructure mandates.
| Regime | P10 Equity IRR | Prob. below 12% hurdle | Engineering implication |
|---|---|---|---|
| Contracted availability (7% vol) | 24.1% | 0.0% | Tight revenue band keeps even the P10 downside comfortably positive, matching institutional core infrastructure mandates. |
| Volume-linked base (14% vol) | 22.3% | 0.0% | Moderate revenue-cost correlation (+0.35) cushions part of the margin variance while exposing tail downside. |
| Stagflation shock (22% vol, -0.40 rho) | 19.3% | 0.0% | Negative correlation (falling throughput paired with rising operating costs) widens the P10 downside tail sharply. |
Comparison of P10 equity IRR and probability below 12% hurdle across availability, volume-linked and stagflation regimes.
Source: Tie Wang seeded Monte Carlo engine (deterministic browser model)
04 · Institutional capital logic
Global infrastructure funds delivered an average annual return of Sourced infra-3 · 2022 Average annual return of global infrastructure funds between 2016 and 2022, with 10.9% projected for 2022 to 2028 World Bank, Infrastructure Monitor 2024 (published April 2025) Open public record ↗ between 2016 and 2022 while allocating Sourced infra-4 · 2023 Share of infrastructure fund capital allocated to low-risk debt, core and core-plus strategies World Bank, Infrastructure Monitor 2024 (published April 2025) Open public record ↗ of their capital to low-risk debt, core and core-plus strategies. Long-term pension and sovereign investors care less about a speculative 22% upside case than about whether the P10 downside preserves capital and clears debt covenants without forced equity injections.
Notice how the median P50 IRR often trails the deterministic zero-volatility IRR when leverage is high and asymmetric tax rules apply: good years pay full corporate tax while bad years absorb fixed debt service dollar for dollar. Running a seeded simulation exposes that Jensen's inequality drag immediately.
Unseeded random simulations cannot be audited because two analysts running the same spreadsheet obtain different numbers. Fixing the generator algorithm (Mulberry32) and encoding the seed directly inside the URL guarantees that a credit officer opening a shared link sees the exact percentile table the financial adviser cited in committee.
What remains outside this screening tool: full balance-sheet working capital, serial autocorrelation of commodity prices across multi-year troughs, inflation swaps and subordinated shareholder loan waterfalls.
05 · Action by counterparty
Evaluate how tariff indexation and volume-sharing corridors narrow the return fan without transferring fiscal upside away.
Risk-allocation term sheet with P10/P90 bounds
Test gearing limits at P10 downside so senior debt stays insulated across negative revenue-cost correlation regimes.
Credit-committee Monte Carlo appendix with fixed seed
Identify whether cost inflation or throughput variance dominates equity risk, focusing hedging on the binding driver.
Variance attribution brief for operating contracts
Present domestic pension funds and equity co-investors with honest P10 to P90 ranges rather than point-estimate projections.
Investor information memorandum with reproducible seed