Operable engineering instrument
Computed Precious-metals screening versus reference assay uncertainty budget
Adjust XRF surface bias, sample heterogeneity, scale error and calibration drift to test whether a field screening measurement stays inside an illustrative 0.50% check-assay reconciliation gate.
Combined standard u_c 0.199 %
Expanded uncertainty U 0.397 %
Statutory limit 0.50 %
Headroom / breach +0.103 %
GUM RSS VERDICT Within statutory accuracy limit · Custody-transfer certificate valid Dominant variance contributor: Doré surface & matrix bias
XRF shot repeatability 16.2% Doré surface & matrix bias 49.7% Bar heterogeneity (drill vs surface) 25.4% Analytical balance uncertainty 2.3% CRM calibration check drift 6.3% Source: Live JCGM 100 RSS combination held against illustrative 0.50% screening-to-fire-assay gate