Sector · Flow: signal · governPrimary heat: auditor
Maritime domain awareness and fisheries
How can a coastal state monitor hundreds of thousands of square kilometres of exclusive economic zone, catch dark transshipment and verify licensed fishing without buying an unaffordable naval fleet first?
01 · Sovereign waters & dark-vessel economics
A coastal state cannot patrol what it cannot see, and cannot prosecute what it cannot prove
Under UNCLOS Part V, a coastal state exercises sovereign rights over natural resources across its 200-nautical-mile exclusive economic zone. When industrial trawlers switch off AIS transponders, conduct illegal at-sea transshipments or under-report landed catches, software-led multi-sensor fusion exposes violations long before patrol vessels leave port.
Global aquatic animal output (2022) Sourced
Sourcedfish-1 · 2022Global production of aquatic animals reached a record 185 million tonnes in 2022, up 4% from 2020, according to the Food and Agriculture Organization.Food and Agriculture Organization (FAO), The State of World Fisheries and Aquaculture 2024 (2024) Open public record ↗
Record global aquatic animal production (live weight), with USD 452bn first-sale value (FAO SOFIA 2024).
Global aquatic product exports Sourced
Sourcedfish-4 · 2022Global exports of aquatic animal products reached USD 192 billion in 2022, representing 38% of total production and over 9.1% of agricultural trade, according to the Food and Agriculture Organization.Food and Agriculture Organization (FAO), The State of World Fisheries and Aquaculture 2024 (2024) Open public record ↗
Annual global exports of aquatic animal products, over 9.1% of total agricultural trade (FAO SOFIA 2024).
Global piracy incidents (2025) Sourced
Sourcedfish-7 · 2025Global maritime piracy and armed robbery incidents rose to 137 in 2025, up from 116 in 2024, with 121 vessels boarded and 46 crew taken hostage, according to the ICC International Maritime Bureau.ICC International Maritime Bureau (IMB), Global maritime piracy and armed robbery increased in 2025 (2026) Open public record ↗
Maritime piracy and armed robbery incidents recorded worldwide in 2025, up from 116 in 2024 (ICC IMB 2026).
AIS carriage threshold Sourced
Sourcedsea-2 · 2002Gross tonnage from which ships on international voyages must carry an automatic identification system (AIS)International Maritime Organization, SOLAS Chapter V, Regulation 19 Open public record ↗
Gross tonnage from which ships on international voyages must carry AIS under IMO SOLAS Chapter V, Reg. 19.
Marine fisheries and offshore corridors represent both high-value sovereign assets and persistent security vulnerabilities. The Food and Agriculture Organization reports global aquatic animal production reached a record Sourcedfish-1 · 2022Global production of aquatic animals reached a record 185 million tonnes in 2022, up 4% from 2020, according to the Food and Agriculture Organization.Food and Agriculture Organization (FAO), The State of World Fisheries and Aquaculture 2024 (2024) Open public record ↗ in 2022, with marine areas contributing Sourcedfish-3 · 2022Marine areas produced 115 million tonnes of aquatic animals in 2022, representing 62% of global output, of which 69% came from capture fisheries, according to the Food and Agriculture Organization.Food and Agriculture Organization (FAO), The State of World Fisheries and Aquaculture 2024 (2024) Open public record ↗ (69% from capture fisheries) while aquaculture reached Sourcedfish-2 · 2022Aquaculture produced 94 million tonnes (51%) of aquatic animals in 2022, surpassing capture fisheries at 91 million tonnes (49%) for the first time, according to the Food and Agriculture Organization.Food and Agriculture Organization (FAO), The State of World Fisheries and Aquaculture 2024 (2024) Open public record ↗ . Aquatic animal exports totalled Sourcedfish-4 · 2022Global exports of aquatic animal products reached USD 192 billion in 2022, representing 38% of total production and over 9.1% of agricultural trade, according to the Food and Agriculture Organization.Food and Agriculture Organization (FAO), The State of World Fisheries and Aquaculture 2024 (2024) Open public record ↗ , underscoring why major destination markets now enforce strict catch-origin certificates that block undocumented seafood. Concurrently, maritime security threats persist across major shipping lanes: IMO GISIS logged Sourcedfish-5 · 2024A total of 146 incidents of piracy and armed robbery against ships were reported worldwide in 2024, compared with 150 in 2023, according to the International Maritime Organization.International Maritime Organization (IMO), Reports on Acts of Piracy and Armed Robbery Against Ships: Annual Report 2024 (MSC.4/Circ.269) (2025) Open public record ↗ of piracy and armed robbery globally in 2024, including Sourcedfish-6 · 2024Reported piracy and armed robbery incidents in the Gulf of Guinea decreased by 5 in 2024 from 22 incidents in 2023, according to the International Maritime Organization.International Maritime Organization (IMO), Reports on Acts of Piracy and Armed Robbery Against Ships: Annual Report 2024 (MSC.4/Circ.269) (2025) Open public record ↗ in the Gulf of Guinea (down from 22 in 2023), while the ICC International Maritime Bureau recorded a rise to Sourcedfish-7 · 2025Global maritime piracy and armed robbery incidents rose to 137 in 2025, up from 116 in 2024, with 121 vessels boarded and 46 crew taken hostage, according to the ICC International Maritime Bureau.ICC International Maritime Bureau (IMB), Global maritime piracy and armed robbery increased in 2025 (2026) Open public record ↗ worldwide in 2025.
Patrolling an exclusive economic zone (Sourcedstd-unclos · 1982United Nations Convention on the Law of the Sea, Part V: the exclusive economic zoneUNCLOS Part V Open public record ↗ ) blindly with offshore patrol vessels burns fuel and misses covert behaviour. Industrial vessels engaged in illegal, unreported and unregulated (IUU) fishing routinely disable AIS transponders (governed technically by Sourcedstd-m1371 · 2014Technical characteristics of an automatic identification system using TDMA in the VHF maritime mobile bandITU-R M.1371 Open public record ↗ and mandated above Sourcedsea-2 · 2002Gross tonnage from which ships on international voyages must carry an automatic identification system (AIS)International Maritime Organization, SOLAS Chapter V, Regulation 19 Open public record ↗ under Sourcedstd-solas · 2002Carriage requirements for shipborne navigational systems, including AISIMO SOLAS Chapter V, Regulation 19 Open public record ↗ ), spoof GPS coordinates or transfer catch at sea to refrigerated carrier vessels outside territorial waters. Even when a patrol boat intercepts a suspect vessel, cases collapse in maritime court if electronic tracks, licence status and boarding logs are not preserved in a tamper-evident evidentiary chain.
Tie Wang builds software-first maritime domain awareness and fisheries assurance that multiplies the reach of existing naval, coastguard and fisheries assets. By fusing terrestrial coastal AIS receivers, satellite AIS, satellite synthetic-aperture radar (SAR) and national Vessel Monitoring System (VMS) feeds into one sovereign ledger, automated behavioural rules detect transponder blackouts, protected-zone incursions and at-sea rendezvous in near real time. Every alert creates a hash-chained evidentiary dossier handed directly to a named naval or fisheries enforcement officer.
02 · Public-record evidence
Global marine fisheries scale and maritime security incident trends
Toggle between FAO global aquatic production breakdown (2022) and IMO/IMB maritime piracy incident records (2024 to 2025).
Global marine fisheries production and reported maritime security incidents Sourced
View A shows FAO 2022 aquatic animal production of 185 million tonnes split across marine areas (115m t, 62%) and inland waters (70m t, 38%), with aquaculture at 94m t (51%) and capture fisheries at 91m t (49%). View B compares IMO 2024 global incidents (146, Gulf of Guinea 17) and IMB incidents rising from 116 in 2024 to 137 in 2025.
Source: FAO SOFIA 2024; IMO MSC.4/Circ.269 (2025); ICC International Maritime Bureau (2026)
Inspect accessible data table for this exhibit
Global fisheries output (FAO 2024)
Indicator
Public-record figure
Context
Total aquatic animals
185m t
Record global output with USD 192bn in exports (fish-1, fish-4).
Marine areas total (62%)
115m t
69% of marine production comes from capture fisheries requiring EEZ oversight (fish-3).
Aquaculture total (51%)
94m t
Surpassed capture fisheries (91m t) globally for the first time (fish-2).
Piracy & robbery incidents (IMO / IMB)
Indicator
Public-record figure
Context
IMO global total (2024)
146
Compiled via IMO GISIS from member states and regional centres (fish-5).
IMB global total (2025)
137
Rose from 116 in 2024; 121 vessels boarded and 46 crew taken hostage (fish-7).
Gulf of Guinea (IMO 2024)
17
Down 5 incidents from 22 in 2023 as regional surveillance improved (fish-6).
03 · Study, System, Service
Fusing satellite sensors, fisheries registers and coastguard command desks
Software-led sensor fusion delivers full-EEZ visibility in weeks so coastal states direct patrol assets and port inspections strictly onto verified anomalies.
LAYER 01 · Study S-10
LAYER 02 · System S-10
LAYER 03 · Service S-10
Study: map maritime zones, legal powers and sensor economics
Tie Wang audits existing coastal radar sites, AIS receivers, VMS providers, fisheries licence registries and maritime-court evidentiary rules. Feasibility modelling shows how targeted satellite SAR tasking and a sovereign fisheries register pay for themselves through verified licensing, port-state fees and focused patrol dispatch.
System: turn multi-sensor feeds into court-ready evidentiary dossiers
An in-country sovereign command platform correlates satellite and coastal AIS, mandatory fisheries VMS and periodic SAR imagery automatically. Governed detection models highlight dark vessels and unauthorised transshipments, while a linked fisheries register issues cryptographically verifiable catch certificates for export markets.
Service: analyst-supported watchkeeping with strict public enforcement
Watchstanders monitor live anomalies and prepare timestamped track-and-imagery dossiers, while naval, coastguard and fisheries officers hold sole statutory power to interdict, board, fine or deny port entry. Local maritime-analyst academies transfer operational mastery to national agencies over the term.
04 · EEZ surveillance gates & international standards
Four maritime-awareness gates linking offshore detection to port enforcement
Select an EEZ risk scenario to inspect the illustrative alert threshold, software-first response and targeted sensor expansion.
Active chokepointInshore artisanal exclusion zone
Primary control metric4 h silence + SAR match (illus.)
Variance signalLicensed trawler ceases VMS/AIS transmissions near restricted inshore boundary
Register action (software first)Task scheduled SAR pass, fuse uncooperative hull echo with historical track and alert coastguard duty officer
Hardware trigger (evidence led)Add low-power coastal AIS/VHF mast only at blind headlands identified by reception coverage maps
Illustrative maritime domain awareness and fisheries verification gates Illustrative
Four illustrative MDA gates: Gate 01 AIS/VMS polling gap flagged after 4 hours; Gate 02 dark-vessel SAR correlation triggered over high-risk fishing grounds; Gate 03 at-sea rendezvous proximity flagged below 500 metres for more than 20 minutes; Gate 04 Port State Measures pre-arrival check 48 hours before landing.
Illustrative Source: Tie Wang illustrative MDA and fisheries architecture (all thresholds illustrative; enforcement rules set by national maritime authorities)
International frameworks designed against in MDA and fisheries programmes Sourced
Standard (designed against)
Programme layer
Operational role in sector
UNCLOS Part V
Sovereign jurisdiction
Legal basis defining coastal-state sovereign rights over living and non-living EEZ resources.
FAO PSMA (Port State Measures)
Port enforcement
Binding framework enabling states to deny port access or landing rights to vessels linked to IUU fishing.
IMO SOLAS V/19 & ITU-R M.1371
AIS telemetry
Carriage mandates and VHF TDMA technical characteristics for shipborne automatic identification systems.
ISO/IEC 27001:2022
Command security
Information security governance for sovereign maritime operations centres and multi-agency data sharing.
FIPS 180-4 (SHA-256)
Evidentiary chain
Cryptographic hash chaining preserving vessel tracks and SAR alerts for maritime-court admissibility.
Source: UN, IMO, ITU and FAO treaty and standard publications (designed against; Tie Wang claims no certification)
05 · Project fit, rollout & evidence boundaries
Achieve national EEZ visibility via software feeds before coastal radar networks
A satellite-fused maritime picture and electronic fisheries register cover 100% of a national EEZ within ninety days, avoiding multi-year coastal tower construction delays.
Fitting project types, illustrative structures and working instruments