Skip to main content
Tie Wang Tie Wang Tie Wang Tie Wang
Search
Tie Wang · 22 Menu Pages
Sitemap
00 · Tie Wang

How does a national programme hold up under the lender, the auditor and time?

INS-15 · Instrument · social security · registry & mobile rails Pure tested model Illustrative defaults

Social security coverage projector

How do payroll interoperability and mobile channels lift active contributor ratios?

Yr-10 cover
34.4%
Gain
+18.2 pts
10-yr yield
USD 5548m

01 · Live coverage model

Configure labour structure, interoperability and mobile uptake

Working instrument · Social security coverage projector

Payroll interoperability delivers the largest near-term contribution cashflow, while mobile-money micro-contributions widen labour-force protection across the informal majority.

Illustrative defaults

Inputs

Illustrative
12.0m illustrative

Active working-age population in scope for statutory and voluntary coverage (1m to 80m).

24% illustrative

Workers employed by registered public or private payroll entities (10% to 60%).

55% illustrative

Formal workers with active contributions before registry cross-matching (25% to 90%).

+25 pts illustrative

Formal compliance uplift from tax, company and payroll API exchange (0 to +40 pts, cap 96%).

4% illustrative

Informal and self-employed workers contributing before mobile rails (1% to 20%).

+16 pts illustrative

Informal coverage gain from short-code enrolment and wallet micro-contributions (0 to +35 pts, cap 60%).

USD 720 illustrative

Combined employer and employee annual statutory inflow per active formal worker (USD 180 to 2,400).

USD 120 illustrative

Average annual micro-contribution remitted via mobile wallet or USSD (USD 30 to 400).

5 yr illustrative

Years to reach full target adoption across registries and mobile channels (2 to 8 years).

Computed outputs

Computed
Year-10 coverage ratio 34.4% Baseline 16.2% (+18.2 pts)
New active contributors +2.18m Year 10 total: 4.13m active
Year-10 annual inflows USD 1878m Baseline: USD 1184m/yr
10-yr incremental inflows USD 5548m Pool: 2.9m formal · 9.1m informal
Year 10 split: 2.30m formal active · 1.82m informal mobile contributors

Active contributors over ten years: formal + informal mobile stack (millions)

Solid violet: total active contributors. Dashed bronze: formal contributors only. Grey line: Year-0 baseline.

Computed live
4.5m 0 Year 0 Year 5 Year 10 Total Y10: 4.13m Formal Y10: 2.30m
Method note, equations and assumptions

The projector models formal and informal labour pools separately across a ten-year horizon using a linear digital adoption ramp up to the selected ramp window:

Pool_formal = LF * s_formal  |  Pool_informal = LF * (1 - s_formal)
Ramp(t) = min(1, t / T_ramp)  (t = 0..10)
Formal_Active(t) = Pool_formal * min(0.96, c_f0 + g_f * Ramp(t))
Informal_Active(t) = Pool_informal * min(0.60, c_i0 + g_i * Ramp(t))
Revenue(t) = Formal_Active(t) * C_formal + Informal_Active(t) * C_informal
  • Hard compliance ceilings: formal compliance is capped at 96% and voluntary informal coverage at 60% so slider extremes never create unrealistic 100% enrolment outputs.
  • Incremental inflows: each year's incremental revenue equals total annual contributions minus the Year-0 baseline, summed from Year 1 through Year 10.

Limitations: holds total labour-force size and unit real contribution rates constant across ten years, and models gross contribution inflows rather than long-term actuarial benefit liabilities or investment yields.

Sources and basis

  • ILO World Social Protection Report 2024-26 (September 2024): 52.4% of the global population had at least one social protection benefit in 2023, while 79.6% of people above statutory retirement age received a pension. [link ↗]
  • GSMA State of the Industry Report on Mobile Money 2026 (March 2026): Over USD 2 trillion flowed through 2.3 billion registered mobile money accounts globally in 2025, creating a ubiquitous rail for informal micro-contributions. [link ↗]
  • World Bank ID4D Global Dataset (2022): 470 million people in Sub-Saharan Africa lack official proof of identity, making foundational registry linkage essential for member enrolment. [link ↗]
  • Pure tested model: Deterministic browser calculation model verified by 14 automated unit-test cases including an exact hand-computed 10-year revenue proof.

02 · Ten-year schedule

Annual contributor counts, coverage and inflows

Live 10-year contributor and revenue schedule (accessible alternative to chart) Computed
Year Formal active (m) Informal active (m) Total active (m) Coverage (%) Annual inflows Incremental
Year 0 1.58m 0.36m 1.95m 16.2% USD 1184.3m +USD 0.0m
Year 1 1.73m 0.66m 2.38m 19.9% USD 1323.0m +USD 138.7m
Year 2 1.87m 0.95m 2.82m 23.5% USD 1461.7m +USD 277.4m
Year 3 2.02m 1.24m 3.26m 27.1% USD 1600.4m +USD 416.1m
Year 4 2.16m 1.53m 3.69m 30.8% USD 1739.1m +USD 554.8m
Year 5 2.30m 1.82m 4.13m 34.4% USD 1877.8m +USD 693.5m
Year 6 2.30m 1.82m 4.13m 34.4% USD 1877.8m +USD 693.5m
Year 7 2.30m 1.82m 4.13m 34.4% USD 1877.8m +USD 693.5m
Year 8 2.30m 1.82m 4.13m 34.4% USD 1877.8m +USD 693.5m
Year 9 2.30m 1.82m 4.13m 34.4% USD 1877.8m +USD 693.5m
Year 10 2.30m 1.82m 4.13m 34.4% USD 1877.8m +USD 693.5m

03 · Channel comparison

Comparing formal cross-matching against dual-channel expansion

Registry interoperability funds the platform quickly while mobile channels open mass informal inclusion
Computed
Year-10 coverage 22.2%
10-yr incremental USD 4147m

Cross-matching payroll and tax registries captures formal evasion quickly at high contribution value per worker.

YEAR-10 COVERAGE RATIO RELATIVE TO ACCELERATED CASE Payroll interop only 22.2% Dual channel (baseline) 34.4% Fast 3-yr dual rollout 42.2%
Regime Year-10 coverage 10-yr incremental Engineering implication
Payroll interop only 22.2% USD 4147m Cross-matching payroll and tax registries captures formal evasion quickly at high contribution value per worker.
Dual channel (baseline) 34.4% USD 5548m Combining formal interoperability with USSD and mobile-money micro-contributions more than doubles active coverage.
Fast 3-yr dual rollout 42.2% USD 8336m Shortening digital channel ramp from five to three years brings forward hundreds of millions in reserve inflows.

Comparison of Year-10 coverage ratio and 10-year incremental inflows across formal-only, dual-channel and accelerated rollout regimes.

Source: Tie Wang social security projector (deterministic browser model)

04 · Why dual rails work

Closing the protection gap without branch-office sprawl

The global protection gap and the mobile rail

According to the International Labour Organization, Sourced soc-1 · 2023 Share of the global population covered by at least one social protection benefit in 2023, leaving 3.8 billion people unprotected International Labour Organization (ILO), World Social Protection Report 2024-26: Executive Summary, September 2024 Open public record ↗ of the global population was covered by at least one social protection benefit in 2023 and Sourced soc-2 · 2023 Share of people above statutory retirement age worldwide receiving a pension in 2023 International Labour Organization (ILO), World Social Protection Report 2024-26: Executive Summary, September 2024 Open public record ↗ of people above statutory retirement age received a pension, leaving billions outside contributory schemes. In parallel, Sourced id-2 · 2021 People in Sub-Saharan Africa estimated to lack official proof of identity within the 850 million global total World Bank, ID4D Global Dataset 2021, Volume 1: Global ID Coverage Estimates, December 2022 Open public record ↗ people in Sub-Saharan Africa lacked official proof of identity while Sourced momo-1 · 2025 Annual transaction value flowing through mobile money wallets globally in 2025, across 2.3 billion registered accounts GSMA, State of the Industry Report on Mobile Money 2026, March 2026 Open public record ↗ flowed through mobile money wallets globally in 2025.

Traditional social security agencies rely on physical branch declarations and periodic employer audits, which leave large segments of declared payroll under-reported and lock out informal traders who cannot queue at a counter once a month.

Exchange gateway first, micro-contribution rail second

Connecting the social security fund to tax payroll declarations, civil registration and company registries through a signed, hash-chained exchange gateway surfaces non-remitting employers within weeks. Adding a mobile-money and short-code USSD channel lets self-employed workers remit flexible micro-contributions and verify their credited balance immediately by code.

What remains outside this projector: benefit payout rules, pension replacement ratios, administrative cost per active account, and member persistence rates during income shocks.

05 · Action by counterparty

Structuring a national contribution digitalisation programme

Public authority

Mandate signed API cross-matching between tax payroll filings, company registries and the social security member ledger.

Inter-agency registry exchange decree and data schema

Lender

Model fund liquidity against formal compliance ramp speed rather than optimistic informal enrolment assumptions alone.

Actuarial inflow sensitivity table across ramp speeds

Operator

Launch a USSD and mobile-money contribution channel with instant receipt codes for workers without smartphones.

Mobile-money gateway integration and USSD member menu

Local partner

Run employer onboarding desks, trade-association enrolment drives and regional support centres outside the capital.

Employer and informal-association enrolment campaign