How does a national programme hold up under the lender, the auditor and time?

INS-18 · Instrument · auditor's heat · evidence provenance Pure tested model Illustrative defaults

Evidence maturity grader

What share of a study rests on measured records versus assumptions with sensitivity bounds?

Maturity
83.7 / 100
Firm share
81.5%
Band
Violet

01 · Live evidence audit

Configure claim ledger counts and verification discipline

Working instrument · Evidence maturity grader

A study is bankable only when zero unbounded figures remain and prose tables are bound directly to the model that proved them.

Illustrative defaults

Inputs

Illustrative
95 illustrative

Field meter logs, lab assays, signed statutory schedules or Grade-A public records (0 to 500, wt 1.00).

68 illustrative

Figures computed deterministically from audited inputs in versioned model code (0 to 500, wt 0.85).

32 illustrative

Engineering or market assumptions carrying explicit low/base/high stress bounds (0 to 500, wt 0.45).

5 illustrative

Hand-typed assertions lacking a primary URL, model key or sensitivity range (0 to 200, wt 0.00 + penalty).

80% illustrative

Share of dossier tables rendered programmatically from the verified model output (0% to 100%).

70% illustrative

Share of primary evidence items checked by a second party against raw records (0% to 100%).

Computed outputs

Computed
Evidence Maturity Index 83.7 / 100 Violet (Audit-Ready)
Auditor's Heat verdict Conditional (Field Work Needed) Firm evidence: 81.5% of 200 claims
Composition vs process 83.6 base Process modifier: +3.8 pts
Unbounded claim penalty -3.7 pts Total assumptions: 18.5%
Action required: clear 5 unbounded claim(s) by attaching a primary source or explicit sensitivity bounds before credit review.

Claim-ledger composition and temper maturity gauge (0 to 100)

Top bar: share of ledgered figures by truth status. Lower bar: overall Evidence Maturity Index along the five temper bands.

Computed live
CLAIM LEDGER COMPOSITION BY TRUTH STATUS (100%) Measured 47.5% Derived 34.0% Bounded 16.0% Unbounded 2.5% EVIDENCE MATURITY TEMPER GAUGE (STRAW 0 TO BLUE 100) 0 · Straw 38 · Bronze 55 · Purple 72 · Violet Index: 83.7
Method note, equations and assumptions

The grader computes a deterministic Evidence Maturity Index (0 to 100) from claim-status weights, a process integrity modifier and an explicit unbounded-claim penalty:

Composition = (1.00 * N_m + 0.85 * N_d + 0.45 * N_b + 0.00 * N_u) / N_total * 100
Avg_Proc = (ModelBoundPct + VerifiedSharePct) / 2
Integrity_Bonus = Avg_Proc >= 60 ? ((Avg_Proc - 60) / 40) * 10 : ((Avg_Proc - 60) / 60) * 15
Unbounded_Penalty = -min(30, Share_u_pct * 1.5)
Maturity_Index = clamp(Composition + Integrity_Bonus + Unbounded_Penalty, 0, 100)
  • Zero-tolerance bankable pass: even when Composition + Process exceeds 82, a single remaining unbounded claim holds the verdict in Conditional until sourced or bounded.
  • Auditor Block: more than 5% unbounded claims or a composite index below 65 triggers Fail.

Limitations: treats every claim with equal materiality rather than weighting high-impact CAPEX or tariff assumptions above secondary footnotes. Formal investment committees pair this index with tornado sensitivity ranking on the top ten financial drivers.

Sources and basis

  • Kleven et al. (Econometrica 2011) & IRS Publication 1415: Third-party verified reporting keeps misreporting near 0.3% to 1%, whereas unverified self-declared claims suffer 37% to 55% error. [link ↗]
  • World Bank Infrastructure Monitor 2024 (April 2025): Revenue-resilient, auditable infrastructure debt recorded a 0.7% five-year cumulative default rate versus 5.4% on weaker structures. [link ↗]
  • Tie Wang Truth & Provenance Discipline: Every figure carries one of four explicit statuses (measured, derived, bounded assumption, illustrative) bound to a live model or primary URL.
  • Pure tested model: Deterministic browser calculation model verified by 14 automated unit-test cases including exact hand-computed composition, penalty and boundary proofs.

02 · Status ledger

Claim counts, shares and weighted score contributions

Live claim-status breakdown table (accessible alternative to chart) Computed
Truth status class Claims Share (%) Weight Contribution
Measured or primary sourced 95 47.5% 1.00 47.5 pts
Derived from tested model 68 34.0% 0.85 28.9 pts
Assumed with sensitivity range 32 16.0% 0.45 7.2 pts
Unbounded or unverified claim 5 2.5% 0.00 0.0 pts

03 · Study stages

How evidence maturity evolves from pitch to bankable DFS

Replacing unbounded estimates with field records and model-bound tables moves a study into bankable Blue grade
Computed
Maturity index 99.1 / 100
Auditor verdict Pass (Bankable Evidence)

Every numeral traces to field measurement, tested model code or bounded sensitivity; zero unverified estimates remain.

EVIDENCE MATURITY INDEX (0 TO 100) Bankable DFS (0 unbounded) 99.1 / 100 Pre-feasibility (default) 83.7 / 100 Unverified pitch deck 19.7 / 100
Regime Maturity index Auditor verdict Engineering implication
Bankable DFS (0 unbounded) 99.1 / 100 Pass (Bankable Evidence) Every numeral traces to field measurement, tested model code or bounded sensitivity; zero unverified estimates remain.
Pre-feasibility (default) 83.7 / 100 Conditional (Field Work Needed) Strong measured and model-derived base, but five unbounded claims hold the dossier in Conditional status until closed.
Unverified pitch deck 19.7 / 100 Fail (Auditor Block) Hand-typed tables and unverified figures trigger an immediate Auditor Block well before credit committee submission.

Comparison of Evidence Maturity Index and auditor verdicts across bankable DFS, pre-feasibility and unverified pitch dossiers.

Source: Tie Wang evidence maturity grader (deterministic browser model)

04 · The auditor's heat

Why unledgered spreadsheets break during diligence

Third-party evidence versus self-declared numbers

Empirical public-finance research confirms the vast gap between verifiable records and unverified assertions: under third-party reporting, evasion drops to Sourced tax-1 · 2011 Evasion rate on income reported by third parties (employers, banks) in a randomised tax-audit experiment Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011 Open public record ↗ (and IRS net misreporting holds at Sourced tax-3 · 2022 Net misreporting rate on income subject to substantial information reporting and withholding US Internal Revenue Service, Publication 1415, Federal Tax Compliance Research: Tax Gap Estimates for Tax Years 2014-2016 (with TY 2017-2019 projections, August 2022) Open public record ↗ ), whereas self-reported figures without independent corroboration suffer Sourced tax-2 · 2011 Evasion rate on self-reported income in the same experiment Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011 Open public record ↗ to Sourced tax-5 · 2022 Net misreporting rate on income subject to little or no information reporting US Internal Revenue Service, Publication 1415, Federal Tax Compliance Research: Tax Gap Estimates for Tax Years 2014-2016 (with TY 2017-2019 projections, August 2022) Open public record ↗ misreporting. Project-finance debt tells the same story: revenue-resilient, auditable infrastructure loans held a five-year cumulative default rate of Sourced pf-1 · 2023 Five-year cumulative default rate of revenue-resilient infrastructure loans (1995 to 2023), compared with 5.4% for non-revenue-resilient infrastructure debt World Bank, Infrastructure Monitor 2024, April 2025 Open public record ↗ compared with far higher losses on opaque structures.

Every national feasibility study passes through three heats: lenders stress its cashflows, auditors trace its figures, and fifteen years of operation test its resilience. A dossier whose tables were pasted by hand from diverging spreadsheet tabs fails the auditor's heat on day one of diligence.

Binding documents to the model that proved them

Tie Wang structures studies around a single claim ledger where every figure declares its exact status: measured or sourced to a primary record, derived from unit-tested model code, or assumed with an explicit sensitivity range. When an input changes during negotiation, every downstream exhibit and table regenerates automatically with zero transcription drift.

What remains outside this grader: legal enforceability of underlying permits, counterparty creditworthiness, environmental baseline sampling protocols and geopolitical macro assumptions.

05 · Action by counterparty

Applying evidence maturity gates before financial close

Public authority

Require every feasibility study and unsolicited proposal to ship with a machine-readable claim ledger tagging every figure.

Mandatory study claim-ledger submission rule

Lender

Refuse credit-committee review for any dossier carrying unbounded figures or manually re-typed financial tables.

Pre-diligence evidence maturity gate (Blue band)

Operator

Generate document tables and exhibits directly from the versioned financial and engineering models so numbers cannot drift.

Model-bound automated document pipeline

Local partner

Collect primary site measurements, tariff decrees and statutory schedules early to replace screening assumptions with verified records.

Primary field evidence and statutory register